Chapter 1 Overview Chapter 1 Overview ASCO Series 230 C2000 Intelligent Controller (hereinafter referred to as Controller) is used to control the Series 230 transfer switch. The Controller is designed to control two sources. When either source has over voltage, low voltage, failure, or abnormal frequency, the Controller will instruct the transfer switch to transfer to a better source or transfer to the center-off position in order to protect the load.
Chapter 1 Overview RS485 with MODBUS communications protocol Up to 100 event log recording capability. Log is saved in the event of a power loss. 1.3 Technical Parameters Application condition requirements of C2000 Controller as shown in Table 1-1. Table 1-1 Application Conditions of C2000 Requirement Condition Standards...
LTSC2000SLW03 04110370 Length: 200mm Series 230 C2000 Intelligent Controller User Manual 31012586 Note: Controller Power & Signal Cables are included with the ASCO Series 230 Transfer Switch Unit packaging. ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
! ! ! ! DANGER Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage. ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Chapter 2 Installation and Wiring This chapter introduces the installation and wiring of the Controller. ! ! ! ! WARNING 1. The controller should be installed with the operation panel on the outside of the panel or door. 2. When doing any maintenance, Controller MUST BE disconnected from all power sources. 3.
Controller, making sure to push each snap up against the panel as snug tight as possible, preventing the Controller from sliding in and out of the opening, as shown in Fig. 2-3. Figure 2-3 Corner Snap Installation ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Chapter 2 Installation and Wiring 2.1.3 Controller Wiring Use the grounding cable LTSC2000SLW03 provided with the C2000 Controller to connect the grounding port located on the side of the Controller and the grounding port on the cabinet. Grounding Screw on Controller Figure 2-4 Grounding Port on C2000 Controller !...
Page 13
Port Port label DRV1 DRV1 DRV2 DRV2 DRV3 DRV3 DRV4 DRV4 DRV5 DRV5 DI1+ DI1+ DI1- DI1- DI2+ DI2+ DI2- DI2- DI3+ DI3+ DI3- DI3- DI4+ DI4+ DI4- DI4- ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Chapter 2 Installation and Wiring 2.2 Controller Interface and Connection Cable Information 2.2.1 Controller Interface C2000 Connector Labels as shown in Fig 2-6 Signal Connector User Connector Power Connector User Connector Figure 2-6 C2000 Controller Interfaces Pin definition as table 2-3, table 2-4 and table 2-5 Table 2-3 Power connection Pins definition of C2000 controller Port Port Label...
Page 15
DI3+ Passive Digital input, transfer switch AUTO/MANUAL position detect, Close means transfer switch on MANUAL, Open means transfer switch on AUTO. DI3- DI4+ User define Passive Digital input. DI4- ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 16
Chapter 2 Installation and Wiring Table 2-5 User Connector Pins Definition of C2000 Controller Port Port label Port attribute Pin Definition Normally Closed (NC) & Normally Open (NO) relay outputs. When the load voltage drops to 30Vdc/125Vac, 30% of the rated voltage or load voltage drops LLP RLY 0.5A≥Rating current≥5mA to 50Vac, the NC relay output will change to...
8 Purple 6 Gray 9 Gray 5 White 10 White 4 Pink 11 Pink 3 Light Blue 12 Light Blue Signal Cable 1500±30 Figure 2-9 Cable Diagram of Signal Cable ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Chapter 3 Operation Chapter 3 Operation 3.1 Operation Panel There is a LCD display screen, LED Indicators and operation keys on the Controller operation panel, as shown in Fig. 3-1. Operation Mode Alarm Status Indicator Indicator Indicator Source II Available Indicator Display Source I Available...
Chapter 3 Operation 2. Pole Transfer Switch, Single-Phase AC Input: Page Description Voltage of Source I (V) Parameters of Source Voltage of Source II (V) I and Source II Frequency of Source I (Hz) Frequency of Source II (Hz) Current Date and Time Time: YYYY-MM-DD HH : MM : SS 1.
“Down” keys to change the setting values, and press “Esc” key to cancel and invalidate the setting. Re-press “Enter” key to save the current setting values or jump to next setting item if there are more than one item on the page. ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 22
Chapter 3 Operation Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 23
YES: restore default Restore the default values of all Default Setting settings parameters. NO: no operation YES: clear the logs Clear Log Clear all recorded logs. NO: no operation ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 24
Chapter 3 Operation Control Settings 2. SETTINGS Control Default Parameter Setting range Description value ENTER Choose line-to-neutral voltage for 2 pole. 2.1 Rated Vol 220V / 230V / 240V / Rated Voltage 380V Choose line-to-line voltage for 3 pole or 4 380V 380V / 400V / 415V pole.
Page 25
If frequency returns to 95% of rated Source II frequency, then switch will tranfser. 95% 90%~100% Frequency Note: press and hold "Up" and “Down” keys Pick Up can quickly change the numbers. ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 26
Chapter 3 Operation Time Delay Settings Default Parameter Setting Range Description Value Override Time delay applied to Source I (includes test and Momentary confirm whether it is Normal or not, in order to avoid Source I 0s~3s any wrong judgment due to instant abnormal voltage Outage impulse).
Page 27
Enter the startup hour for automatic test. NOTE: HH:MM, Startup Time 00:00 Using 24 Hour Method Amount of time required to run the generator test. Running Time 00:00 NOTE: HH:MM, Using 24 Hour Method ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
This chapter introduces how to test the controller after installation, to make sure everything is working properly. This chapter also includes maintenance and troubleshooting information. 4.1 Start Up / Function Test Please refer to ASCO Series 230 Transfer Switch Manuals for start-up and functional testing procedures. 4.2 Maintenance To ensure consistent reliability of the transfer switch to make sure it is operating normally, regular maintenance testing should be conducted.
Source II over voltage S2UF Source II under frequency S2OF Source II over frequency S2VUNB Source II unbalance S2PHR Source II phase rotation Handle Switch transfer By handle (manual) ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Appendix 2 Battery Replacement Appendix 2 Battery Replacement The battery socket is under the Controller side, as shown in the following figure: Lithium Batterry Battery Housing Groove How to replace the battery: 1. Using the groove, pop out the battery housing from the controller enclosure. Be careful to NOT pull out battery housing too quickly to avoid pulling out loose battery wires.
Here is the formula to calculate three-phase imbalance: − − ε − In which, Judgment for power frequency effectiveness Over frequency threshold 0.5Hz Over frequency hysteresys threshold Under frequency hysteresys threshold Under frequency threshold Source available ASCO Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...
Page 32
Appendix 3 Power Properties Judgment of power Unbalance effectiveness Series 230 Automatic Transfer Switch C2000 Intelligent Controller User Manual...