2.3 - Roof Edge Protection During Transport
(Outside Installation)
Roof edge transport protection
During transport by truck the units are attached to the
loading surface with tie ropes, pulled across the unit
towards the side edges of the truck.
On external units, to protect the roof edge from
distortion by the tie ropes protection plates are added.
2.4 – Offloading and Hoisting
Depending on the dimensions of the AHU and the
situation on site, the AHUs are supplied in previously
agreed transport sections.
Before proceeding with the transport and installation of
the casing sections, always consult the applicable
dimensional drawing which shows the dimensions and
weights of the sections, as well as the installation
sequence.
The weight is given on each transport section. Each
transport section is equipped with a sub frame with
four lifting points. These points are marked by the label
shown below.
For offloading as well as hoisting lifting cables can be
attached
1) Under the wooden skid OR
Bed Truck
5
2) To the lifting bars. (Lifting bars are not
supplied by factory )
Evenly positioned spacer bars should be used
between the lifting cables to prevent damage to the top
of the unit and ensure that no excess pressure is
applied to the side panels. For hoisting please ensure
that the weight is evenly distributed.
For hoisting please ensure that the
weight is evenly distributed.

2.5 - Horizontal Transport

For horizontal movement pallet lifters or transport skids
can be placed under the installation frame or under the
lifting bars. It is important that these support the lifting
points. At no time should the cross beams at the ends