Operation; Setting The Desired Airflow - Stratasys ProAero Installation And User Manual

Air extraction system
Hide thumbs Also See for ProAero:
Table of Contents

Advertisement

Operation

2. Connect the exhaust duct to the adapter on the printer and secure the duct to the adapter.
Operation
The air extraction system features a fused IEC inlet for the power cable, as well as a main
power switch.

Setting the Desired Airflow

The air extraction system features a manual flow control that enables the user to adjust the
required airflow rate. Over time, as the filters become restricted, the user should manually
increase the motor speed to maintain the correct flow rate, and compensate for any loss in
performance.
To adjust the airflow:
Press
indicated on the vertical row of six blue LEDs. As you increase the airflow, more blue LEDs
light.
The vent out of the printing area should be as close as possible to the printing
area without interfering with the 3D printing process, to ensure effective fume
extraction.
The system and all connecting tubes must be fully installed and connected before the
airflow is set.
to increase airflow and press
Filter change
indicator
When first installing the system, set the airflow on the second LED from the bottom.
© Copyright 2020 Stratasys. All rights reserved.
to decrease airflow. The level of airflow is
Figure 6: Control panel
Motor speed
adjustment
Setting the Desired Airflow
Page 8

Advertisement

Table of Contents
loading

Table of Contents