Checking The Rubber Buffers - Fayat Group BOMAG BP 12/40 Operating Instructions Manual

Hide thumbs Also See for BOMAG BP 12/40:
Table of Contents

Advertisement

Tightening the V-belt
Fig. 46
Pull the engin carrier back (Fig. 46) until the
l
correct V-belt tension is achieved and tighten
the four fastening screws.
Assemble the V-belt guard.
l
Caution
!
Check the V-belt tension again after a running
time of approx. 25 operating hours, retighten if
necessary.
BP 12/40, BP 20/50, BP 25/50
Maintenance every 6 months
5.17 Checking the Rubber Buff-
ers
Fig. 47
Check the condition and tight fit of all rubber
l
buffers and exchange if necessary (Fig. 47) .
BOMAG
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents