ECEIVING
The shipment should be thoroughly inspected as
soon as it is received. The signed bill of lading is
acknowledgement by the carrier of receipt in
good condition of shipment covered by our
invoice.
If any of the goods called for on this bill of lading
are shorted or damaged, do not accept them until
the carrier makes a notation on the freight bill of
the shorted or damaged goods. Do this for your
own protection.
Quality Lifts
NOTIFY
loss or damage is discovered after receipt.
IT IS DIFFICULT TO COLLECT FOR LOSS OR
DAMAGE AFTER YOU HAVE GIVEN THE
CARRIER A CLEAR RECEIPT.
File your claim with Q
Support your claim with copies of the bill of
lading, freight bill, and photographs, if available.
Component Packing List
PART #
QTY/ LIFT
JSJ6-02-00
JSJ6-02-00f
JSJ6-03-00
Q12-HW-A
JSJ6-02-02-00
JSJ6-02-02-00f
JSJ6-09-00
JSJ6-04-00
Q12-HP
JSJ5-02-14A
Installation, Operation and Maintenance
AT ONCE if any hidden
uality Lifts
promptly.
DESCRIPTION
Power Column
1
Assembly
Idler Column
1
Assembly
1
Overhead Assembly
1
Hardware Box
Power Column
1
Extension
Idler Column
1
Extension
4
Arm Assemblies
Synchronizer Cable
2
Assembly
Hydraulic Hose
1
Pack
2
Lock Cover
Page 4
Model Q12
I
NSTALLATION
I
:
MPORTANT
Always wear safety glasses while installing lift.
T
(
OOLS
MINIMUM REQUIRED
a. Tape measure, 16ft
b. Chalk line
c. 4ft level
d. 10" adjustable wrench
e. Metric open end wrenches 10mm, 13mm,
14mm, 15mm, 17mm, 18mm, 19mm and
24mm
f.
Metric Allen Wrenches 4mm, 5mm, 6mm,
and 8mm.
g. Needle Nose pliers
h. Snap Ring pliers
i.
Hammer drill with 3/4" diameter carbide
tipped bits
j.
2lb hammer
k. Torque wrench: 150 foot pounds minimum
with 1 1/8" socket
l.
12 ft. Step ladder
m. Anti-Seize lubricant (for arm pins and foot
pad screw threads and stop rings)
L
AYOUT
1) Layout the service bay according to the
architect's plans or owners instructions (see
Fig
1b).
orientation can result in personal and
property damage.
proper conditions exist, see page 3.
2) Assemble column extension to column using
M12 x 30 Hex bolts. Repeat for opposite
column and extension. Install power column
extension on power column. NOTE: install
with nut and washer on the exterior of the
column.
3) Using the Overall Width (C) Dimension from
Fig 1, chalk two parallel lines on the floor
within 1/8" tolerance. Erect both column
assemblies. Align the base plate edges to the
chalk lines.