Label Auxiliary Functions; Temp Calibrate; Solar Priority (If Applicable); Assign Jva - Polaris PAC PAGAUT Owner's Manual

Above-ground pool automation control
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
Page 10
Select type of light installed (e.g., Jandy Colors
Jandy
LED Light ) and assign the light to an available
®
auxiliary relay.
Select Light Type:
INSTALL SETTINGS
Color Lights
>
Label Aux
>

Temp Calibrate

>
Solar Priority
>

Assign JVA

>
>
More
Assign Selected Light to an Auxiliary:
SELECT LIGHT
Jandy Color
Jandy LED
• JC is displayed next to AUX if a Jandy Colors light
has been assigned.
• JL is displayed next to AUX if a Jandy LED Light
has been assigned.
• Press Select button with JC or JL highlighted to
toggle control by the auxiliary on or off.
7.6

Label Auxiliary Functions

INSTALL SETTINGS>LABEL AUX
Assign labels to auxiliary equipment to display text in the
user interface instead of AUX 1, 2, or 3.
INSTALL SETTINGS
Color Lights
>
Label Aux
>
Temp Calibrate
>
Solar Priority
>
Assign JVA
>
>
More
Label = Aux2
<Default>
Aerator
Air Blower
Backwash
A-Z
Chlorinator
More
• Choose from labels listed A-Z on each screen.
TM
or
SELECT LIGHT
Jandy Color
Jandy LED
Intellibrit
Color Logic
ASSIGN TO AUX
Jandy Color
Aux1
JC
Aux2
Aux3
LABEL AUX
Aux1
>
Aux2
>
Aux3
>
Label = Aux2
Swim Jet
Valve(s)
Wtr Feature
Waterfalls
Whirlpool
More
Pool Automation Control | Owner's Manual
Polaris
®
PAC
7.7
Temp Calibrate
INSTALL SETTINGS>TEMP CALIBRATE
Adjust temperature displayed on the Polaris PAC up or
down by 4 degrees.
If the temperature is off by more than four
NOTE
(4) degrees, contact your local service
representative.
SYSTEM SETUP
Label Aux
>
Temp Calibrate
>
Solar Priority
>
Assign JVA
>
Color Light
>
More
• Use Up/Down arrows to set new temperature
value.
7.8

Solar Priority (if applicable)

INSTALL SETTINGS>SOLAR PRIORITY
NOTE: You will only see this option if solar heating
is installed in your system.
Enable the system to use solar heat first, when
available. If solar heat is no longer available, the system
will automatically switch to the alternate heat source.
INSTALL SETTINGS
Color Lights
>
Label Aux
>
Temp Calibrate
>
Solar Priority
>
Assign JVA
>
>
More
• When solar and heater are enabled the solar will
heat the water until either the thermostat setting
has been reached or solar heat is no longer
available.
• If the solar panel is not hot enough, solar heat will
shut off and the other heat source (usually gas
heater) will take over to bring the water up to the
thermostat setting.
7.9
Assign JVA
INSTALL SETTINGS>ASSIGN JVA
NOTE: If the system is a pool/spa combination, without
solar, only the solar JVA is assignable. If the
system is a pool or spa only system, without
solar, all three JVAs are assignable. The
example shown is for a pool or spa only system
without solar.
TEMPERATURE
CALIBRATE
Water: 74°F
SOLAR PRIORITY
Enable
Disable

Advertisement

Table of Contents
loading

Table of Contents