Wash painted surfaces of the unit with a solution of ¼ pound of soap chips to one gallon of
water. Rinse with clean water and dry with a lint-free cloth or allow to air dry.
First Maintenance Program
The first maintenance should be done between 10 and 125 hours.
For the maintenance of engine, see operation manual (every machine has the
engine operation manual)
Check oil tank and take correct action in case of oil leakage
Check hose , attachment and electrical wire
Check wheels nut torque after 10 operations hours, also after 50 operation hours, and
after each wheel replacement.