Boiler Plate (Fig. 6); Blast Tube Length (Fig. 7); Securing The Burner To The Boiler (Fig. 8) - Baxi TECNO 70-L Installation, Use And Maintenance Instructions

Light oil burners
Table of Contents

Advertisement

Available languages

Available languages

4.3

Boiler plate (Fig. 6)

4.4

Blast tube length (Fig. 7)

4.5

Securing the burner to the boiler (Fig. 8)

Disassemble the blast tube 9) from the burner 6) by proceeding
as follows:
– Loosen the four screws 3) and remove the cover 1).
– Remove the screws 2) from the two slide bars 5).
– Remove the two screws 4) fixing the burner 6) to the flange 7).
– Withdraw the blast tube 9) complete with flange 7) and slide
bars 5).
Combustion head calibration
At this point check, for model TECNO 130-L, whether the maxi-
mum delivery of the burner in 2nd stage operation is contained in
area B or in area C of the firing rate. See pag. 8.
If it is in area B then no operation is required.
If, on the other hand, it is in area C:
– Unscrew the screws 1) (Fig. 8) and disassemble the blast tube
5)
– Unscrew the screws 3) and remove the shutter 4)
– Tighten the screws 3) on the rod 2)
– Now refit the blast tube 5) and the screws 1)
2916089
Installation
Drill the combustion chamber locking plate as shown in (Fig. 6).
The position of the threaded holes can be marked using the ther-
mal screen supplied with the burner.
mm
TECNO 70-L
TECNO 100-L
TECNO 130-L
Fig. 6
D455
The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its refractory.
For boilers with front flue passes 12) or flame inversion cham-
bers, protective fettling in refractory material 10) must be inserted
between the boiler's fettling 11) and the blast tube 9).
This protection must not compromise the extraction of the blast
tube.
For boilers having a water-cooled front the refractory fettling 10)-
11) (Fig. 7) is not required unless it is expressly requested by the
boiler manufacturer.
D3307
Fig. 7
Once this operation has been carried out (if it was required), se-
cure flange 7) (Fig. 7) to the boiler plate interposing the supplied
gasket 8). Use the 4 screws provided after having protected the
thread with anti-seize products (high-temperature grease, com-
pounds, graphite).
The burner-boiler seal must be airtight.
10
GB
A
B
185
275
185
275
195
275
D690
C
M 12
M 12
M 12
Fig. 8

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Tecno 100-lTecno 130-l143114200143115200143116200

Table of Contents