Putting Into Operation; Installation - Novasina LabTouch-aw Operating Instructions Manual

Hide thumbs Also See for LabTouch-aw:
Table of Contents

Advertisement

3.

Putting into Operation

Installation

3.1
Putting into Operation
3.2
Basic Operations of the Instrument
3.3
The LabTouch-aw measurement instrument is delivered with all necessary
accessories to operate the instrument properly. Upon receipt, please double-
check if everything is present according to the scope of delivery and immediately
notify your Novasina sales partner if anything is missing or broken. Do not put
damaged or incomplete measuring instruments into operation.
The equipment must be installed in a laboratory on an planar surface avoiding
vibrations, strong heat radiation, air flow, dust, direct sunlight exposure and
strong electromagnetic sources.
Make sure the power socket is not in too much distance to the instrument. It
is recommended to store the accessories in close proximity to the instrument.
Use the Novasina power adapter only. Third party products can destroy
the instrument
Check if the local mains voltage matches with the identification plate of
the supplied external power supply and plug it to the socket.
Plug the external power supply cable to the instrument socket on the back
of the LabTouch-aw
Note:
The LabTouch-aw is very efficient and requires only little electrical power.
The power supply complies with the latest standard (fulfills „energy star level
IV") so the instrument can be switched-on permanently and kept ready for
measurements at any time. The LabTouch-aw should only be switched-off,
if no measurements are performed for a longer time period (i.e. more than
one week).
This chapter describes the basic operations as starting-up and shutting-down
of the LabTouch-aw as well as other functions.
3.3.1 Start-up procedure
To start-up the instrument, proceed as follows:
Close the instrument if it has been opened
Power-up the instrument by hitting the black button in front of the instrument
which also can be used for opening the instrument. A beep indicates the
initialization of the starting sequence
The system is started-up which is indicated by two different start-up screens
The start-up sequence is finished after approx. 1 minute and the measu-
rement screen appears
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents