hydrotab AIR UNIT II Installation Manual

Installation with nmea 2000, nmea 0183

Advertisement

Quick Links

Hydro
Hydro
Tab
Tab
Marine Engineering
Marine Engineering
INSTALLATION MANUAL
Hydrotab BT Series
1
NMEA 2000
NMEA 0183
AIR UNIT II

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AIR UNIT II and is the answer not in the manual?

Questions and answers

Summary of Contents for hydrotab AIR UNIT II

  • Page 1 Hydro Hydro Marine Engineering Marine Engineering INSTALLATION MANUAL NMEA 2000 NMEA 0183 AIR UNIT II Hydrotab BT Series...
  • Page 2: Disclaimer

    Trademark Notice Hydrotab is a registered trademark of Fair use statement Olympic Engineering Ltd, Greece. All other This manual can be printed or copied for trademarks, trade names or company your own use only.
  • Page 3: Table Of Contents

    Air Unit II Installation Pneumatic Connection Technical Data + Dimensions Air Unit II Direct Installation Diagram Air Unit II Installation Diagram on existing NMEA network Air Unit II Electrical Diagram Air Unit II Pneumatic Diagram Spare Parts Spare Parts - Valves Assembly...
  • Page 4: Interceptor Installation (Indirect Air Supply)

    Hydro Marine Engineering Interceptor Installation (indirect air supply) In case of indirect air supply, you can use the components included in the kit as shown in the image. Air Unit Installation WARNING: DO NOT MOUNT the Air Unit upside-down THE AIR UNIT MUST BE INSTALLED IN A COMPARTMENT FREE OF EXPLOSIVE OR FLAMMABLE GASES PLEASE INSURE THAT THE AIR UNIT IS INSTALLED ACCORDING TO THE IP30 LIMITATIONS.
  • Page 5: Pneumatic Connection

    Air Unit After you install the hose through the transom, mount the air fitting into the hose. Connect the push-in fitting Technical Data & Dimensions Air Unit II DataSheet Compressor power 250 W Air compressor type Brushless, oil-free Voltage...
  • Page 6: Air Unit Ii Direct Installation Diagram

    Hydro Marine Engineering Direct Installation Diagram - Air Unit II Moby Controller Air Unit ΙΙ Flybridge OPTIONAL controller USE INLINE TERMINATOR CABLE TO 20A FUSE 3m - MF CABLE CABLE 10m - MF 10m - FF In case a new NMEA 2000 instrument to be added, a proper NMEA Network must be built.
  • Page 7: Air Unit Ii Electrical Diagram

    Air Unit II Electrical Diagram Air Unit II Pneumatic Diagram Compressor NM E A 2000 500.AIR-N2Κ-ΤΗ-V2.1 VALVE GROUP CAN-H CAN-L -12/24V RM+12V -12/24V +12/24V F1 F1 Switch + - +12V Battery Compressor Timer (PNE-01249A) IMPORTANT: THE SWITCHES MUST BE STRICTLY SET...
  • Page 8: Spare Parts

    PNE-00647 SWIVEL+OR ELBOW Μ5-2Χ4 PNE-00924 COIL EVI 7/9 10W PNE-00925 THREAD OPERATOR 2/2NC PNE-01113 KNURLED NUT WITH M8 THREAD PNE-01232 VALVE, 4-POSITION, 1/8 with M5 PNE-01233 VALVE, 2-POSITION 1/8, 20x20x30 PNE-00721 ΡΟΔΕΛΑ ΑΛΟΥΜΙΝΙΟΥ, 1/8 REV-00588 AIR UNIT MAX & AIR UNIT II FITTING...
  • Page 9: Troubleshooting

    Hydro Marine Engineering Troubleshooting Moby Controller is Moby Controller is ON but flaps do not ON but flaps do not operate on manual operate on manual Go to System Information. Do you notice N2K error and Temperature Offline? 1) Open the air unit. 1) Is there power supply 2) When buttons ↑↓←→...
  • Page 10: Warranty Conditions

    Hydrotab's warranty only covers the repair or replacement of spare parts. System selections It is the sole responsibility of the buyer to choose the correct system and even with Hydrotab’s suggestion for a system, the overall responsibility is with the buyer.
  • Page 11 Hydro Marine Engineering Notes...
  • Page 12 Hydro Marine Engineering 4, Papazoglou str. Hydro GR-17778 Athens Greece email: info@hydrotab.gr Marine Engineering website: www.hydrotab.gr REV.B...

This manual is also suitable for:

Asm-01342

Table of Contents