Step 6 — Trap Condensate Drain —
for drain location. One
3
inside unit evaporator section for condensate drain connec-
tion. An 8
1
in. x
3
-in. diameter and 2-in. x
2
4
pipe nipple, coupled to standard
vides a straight path down through hole in unit base rail (see
Fig. 12). A trap at least 4-in. deep must be used.
Step 7 — Install Gas Piping —
use with natural gas. Installation must conform with local
building codes or, in the absence of local codes, with the
National Fuel Gas Code, ANSI Z223.1.
Install manual gas shutoff valve with a
sure tap for test gage connection at unit. Field gas piping
must include sediment trap and union. See Fig. 13.
Do not pressure test gas supply while connected to unit.
Always disconnect union before servicing.
Natural gas pressure at unit gas connection must not be
less than 5 in. wg or greater than 13.5 in. wg.
Size gas-supply piping for 0.5-in. wg maximum pressure
drop. Do not use supply pipe smaller than unit gas connec-
tion (
3
-in. NPT).
4
See Fig. 11
-in. half coupling is provided
4
3
-in. diameter
4
3
-in. diameter elbows, pro-
4
Unit is equipped for
1
-in. NPT pres-
8
Fig. 11 — Condensate Drain Details
Fig. 12 — Condensate Drain Piping Details
Fig. 13 — Field Gas Piping
8
3/4" FPT DRAIN
1-3/8"
CONNECTION
DRAIN HOLE