Preparation
If you use a back box FDMH295-R, you have to determine the positions of the
lead-in openings. If the lead-in openings are on the top or bottom, you must
determine them with the drilling jig (package insert).
Procedure
B
A
Installation
Note the positive and negative poles!
1. Mount the back box at a height of 1.3 ... 1.6 m on a flat surface.
2. If the detector line cables are shielded, connect the shieldings to a connection
terminal (to be ordered separately). The shieldings must not touch any other
potentials or metal parts in the device.
3. Connect the detector line. Connect only one wire to each terminal.
4. Insert a line termination element (EOL) at the end of each collective detector
line into the connection terminal. The line termination element depends on the
type of control panel.
5. Remove the cover of the manual call point using the key (movements A and B).
Keep the key in a safe place.
6. Secure the switching unit to the wall or back box. You will find the screws you
need for the back box in the switching unit.
7. Assemble the manual call point. Be sure to tension the spring with the plastic
insert or glass insert.