Vision TM-CAGE Owner's Manual page 3

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
PROJECTOR TM-CAGE TECHMOUNT
OWNERS MANUAL
Congratulations on your choice of the
Vision TM-CAGE TECHMOUNT. In order
to obtain the best performance please be
sure to read this owner's manual and use
your product only in accordance with the
instructions. An electronic version of this
manual and further information can be
found on www.visionaudiovisual.com
WARNINGS
During installation take care to adhere to workplace health and safety laws:
• Attach the bracket to a rated load-bearing structure. NEVER MOUNT CAGE OR
BRACKET DIRECTLY TO A FALSE CEILING!
• Do not cut or drill any parts above head height. This should all be done using the
correct safety equipment at fl oor level.
• Avoid overstretching which might result in the ladder tipping over.
• SWL (safe working load): 7kg
If you are unsure about the load-bearing capacity of the structure you are attaching the
bracket to, we recommend testing it with your body weight by hanging off it gently. If
you are uncomfortable doing this, it is probably not safe.
This product is a theft deterrent and does not guarantee the security of your projector.
Alarm batteries should be tested at time of installation and annually. Vision's liability is
limited to the terms set out in the warranty.
Vision is a partner in the TÜV SÜD product certification system. All applicable certification is
provided by TÜV. All products are designed and imported into the EU by 'Vision' who is wholly
owned by Azlan Logistics Ltd, Registered in England Nr. 04625566 at 'Lion House, Pioneer Business
Park, Clifton Moor, York, YO30 4GH'
WEE/AB0047SY
1

Advertisement

Table of Contents
loading

Table of Contents