jcb G20 Operator's Manual page 119

Table of Contents

Advertisement

A Cover
C Cable 1
E Cable 2
1. Make the machine safe.
2. Use the handles to put the battery into its compartment.
3. Connect the cable 1 and the cable 2.
4. Install the cover (if removed).
5. Install the clamp.
6. Install the two nut and the two washers.
7. Check the battery terminals.
Refer to: Clean (Page 110).
112
Figure 91.
A
F
E
B Nut
D Handle
F Clamp
9831/0650-3
Electrical System
B
C
D
Maintenance
112

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents