Step 6-Completing The Installation - Sinclair ASV-35BS User Manual

Wi-fi camper trailer
Table of Contents

Advertisement

STEP 6-COMPLETING THE INSTALLATION

To complete the installation and system checkout requirements, the following steps must be
performed.
1.
Check the thermostat position. Make sure the thermostat is routed through the holding guide
and is not touching any metal surface.
2.
Secure the ceiling grille to the ceiling assembly wind-path with 4 screws. (see Figure 9).
3.
Install the healthy filter and air intake grill. Press "PUSH" and lock with clasps.
4.
Switch on the power supply and check the unit work or not.
5.
Once the indoor unit is assembled, if the gap between the panel and the top of
vehicle is not even, please ask the manufacturer to adjust it according to the
assembly status.
front panel
Figure 9
filter
4 screw
- 18 -
wind-path
front grill

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asv-25bs

Table of Contents