Furuno NAVNET 1823C-BB Installation Manual page 36

Furuno marine gps system user manual
Hide thumbs Also See for NAVNET 1823C-BB:
Table of Contents

Advertisement

8. Connect the signal cable to the RTB Board (03P9249 or 03P9250), referring to the
interconnection diagram and the figure below.
9. Attach three EMI cores to the signal cable as shown below.
EMI core
RFC-13
10. Fix the signal cable with the cable clamp.
11. Release the stay and close the cover. Loosely fasten the scanner bolts; you will have to
make some adjustments inside after completion of wiring.
Note: When closing the cover, set the gaskets to grooves in the bottom chassis, then
tighten bolts.
1-26
Lead in
cable here.
Route cable along here.
Antenna unit chassis, cover opened
BOTTOM
CHASSIS
GROOVE
GASKET
Torque : 9.8 ±0.1 N m
RTB Board
Clamp
SCANNER BOLT
.
J821 VH9P
J824 NH13P
J823 VH4P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1833c-bb1933c-bb1943c-bb1953c-bbGd-1900c-bb

Table of Contents