2. Installation and Adjustment:
(1). Motor installation:
When motor and machine installed together, refer to the machine head's instruction.
(2). Control Box Installation:
a). Leave 100 mm space at right
(3). Speed Control Unit Installation:
a). Keep rod in vertical, secure the unit under the table
(4). Adjust the Speed Control Unit:
Components of the speed control unit: see figure
A: Spring for toeing forward force adjustment
B: Bolt for heeling backward force adjustment
C: Treadle / Pedal arm。
D: Pitman Rod for Treadle / Pedal
Term of adjustment
Toeing forward
1
force adjustment
Heeling backward
2
force adjustment
Treadle stroke
3
adjustment
b). Mounting TD under the working table
Measurement
100 mm
60mm
Adjustment result
Spring A move to right = force increased
Spring A move to left = force decreased
Bolt B turn
= force decreased
Bolt B turn
= force increased
Rod D secure at right = stroke is longer,
Rod D secure at left = stroke is shorter。
247.5mm
232.6mm
175.6mm
b).Installation layout
3
c). Installation layout
Control
box