Samsung Smart MBS RRH-P4 Installation Manual page 59

Table of Contents

Advertisement

2600-00CTEIGAA
Ver.
F) Fix the cable to the hoisting wire with a cable tie at regular intervals [within 3.28 ft (1 m)] to prevent
impact or tension to the upper side of the junction box when lifting the hoist.
Maintain hoisting wire in a straight line, separate the RRH-side cable's curve from the hoisting wire
with 5.9 in. (150 mm) or more distance. And fix cable and wire with cable tie.
(When lifting the hoist, be careful not to apply tension to other areas of the hybrid cable except where
the pulling wire is attached.)
Hybrid Cable
More than 5.95 in.
(150 mm)
Hoisting Wire
© SAMSUNG Electronics Co., Ltd.
4.0
Figure 2.21 Installing Hybrid cable (4)
Smart MBS RRH-P4 Installation Manual/Ver.3.0
Pulling Wire
Junction Box
(Breakout Point)
Hoisting Wire
Max. 3.28 ft (1 m)
Max. 3.28 ft (1 m)
Max. 3.28 ft (1 m)
2-29

Advertisement

Table of Contents