Page 1
All manuals and user guides at all-guides.com Installation Instructions Firewood boiler S3 Turbo Translation of the original German installation instructions for technicians Read and follow the instructions and safety information! Technical changes, typographical errors and omissions reserved! M1080813_en | Edition 30/09/2013 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
Setting and checking the seal on the doors Positioning the doors Installing the boiler 4.5.1 Assembly overview Insulation Air duct system WOS system S3 Turbo 18-28 WOS system S3 Turbo 36-45 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
Page 3
All manuals and user guides at all-guides.com Table of Contents 4.5.2 Installing the flue gas pipe nozzle 4.5.3 Fit the induced draught fan 4.5.4 Installing the pneumatic rods for the primary and secondary air 4.5.5 Final steps before insulating 4.5.6 Installing the insulation 4.5.7 Installing the door switch...
All manuals and user guides at all-guides.com General 1 General Thank you for choosing a quality product from Froling. The product features a state-of- the-art design and conforms to all currently applicable standards and testing guide‐ lines. Please read and observe the documentation provided and always keep it close to the system for reference.
All manuals and user guides at all-guides.com Safety Hazard levels of warnings 2 Safety 2.1 Hazard levels of warnings This documentation uses warnings with the following hazard levels to indicate direct hazards and important safety instructions: DANGER The dangerous situation is imminent and if measures are not observed it will lead to serious injury or death.
All manuals and user guides at all-guides.com Safety Qualification of assembly staff 2.2 Qualification of assembly staff CAUTION Assembly and installation by untrained personnel: Risk of personal injury and damage to property. During assembly and installation: ❒ Observe the instructions and information in the manuals ❒...
All manuals and user guides at all-guides.com Safety Design Information 2.4 Design Information 2.4.1 Notes on standards The system must be installed and commissioned in accordance with the local fire and building regulations. The following standards and regulations should always be ob‐ served: General standards for heating systems EN 303-5...
All manuals and user guides at all-guides.com Safety Design Information Standards for permitted fuels EN 14961-3 Solid bio-fuel - Fuel specifications and classes Part 2: Wood briquettes for non-industrial use EN 14961-5 Solid bio-fuel - Fuel specifications and classes Part 5: Firewood for non-industrial use 1.
All manuals and user guides at all-guides.com Safety Design Information Unless otherwise specified in the applicable building regulations for the boiler room, the following standards apply to the design and dimensions of the air ducts: Note on standards ÖNORM H 5170 - Construction and fire protection requirements 2.4.4 Requirements for central heating water The following standards and guidelines apply: Note on standards...
All manuals and user guides at all-guides.com Safety Design Information 2.4.5 Notes for using pressure maintenance systems Pressure maintenance systems in hot-water heating systems keep the required pres‐ sure within predefined limits and balance out volume variations caused by changes in the hot-water temperature.
All manuals and user guides at all-guides.com Safety Design Information 2.4.7 Combination with storage tank Observe the regional regulations for using a storage tank! Certain subsidy guidelines prescribe compulsory requirements for the installation of storage tanks. Up-to-date information about individual subsidy guidelines can be found at www.froeling.com.
Page 12
All manuals and user guides at all-guides.com Safety Design Information Recommended storage tank capacity: Unit S3 Turbo S3 Turbo 18 - 28 36 - 45 1700 3000 Recommended storage tank capacity 1. Values for calculating the capacity can be found in the technical data or the technical data with partial load inspection (if available) Germany The first BImSchV (Ordinance on small and medium-sized heating plants of 26 Janu‐...
All manuals and user guides at all-guides.com Safety Design Information 2.4.8 Chimney connection/chimney system EN 303-5 specifies that the entire flue gas system must be designed to prevent, wher‐ ever possible, damage caused by seepage, insufficient feed pressure and condensa‐ tion.
All manuals and user guides at all-guides.com Technology Dimensions 3 Technology 3.1 Dimensions Di‐ Description Unit S3 Turbo S3 Turbo men‐ 18-28 36-45 sion Length, boiler 1160 1250 Total length incl. induced draught fan 1260 1350 Width, boiler Total width inc. side cleaning door Height, boiler 1470 1570...
All manuals and user guides at all-guides.com Technology Components and connections 3.2 Components and connections Item Description Unit S3 Turbo Boiler flow connection inches Boiler return connection inches Drainage connection inches Safety battery connection inches Immersion sleeve for thermal discharge valve (sup‐ inches plied by the customer) Immersion sleeve for boiler sensor and STL...
All manuals and user guides at all-guides.com Technology Technical specifications 3.3 Technical specifications Description S3 Turbo 18 S3 Turbo 28 Nominal output 22.5 Electrical connection 230V / 50Hz / fused C13A Power consumption at nominal load 50 - 70 Power consumption in slumber mode Weight of boiler incl.
Page 17
All manuals and user guides at all-guides.com Technology Technical specifications Test report data Description S3 Turbo 18 S3 Turbo 28 S3 Turbo 18 - 28 Testing institute TÜV Austria TÜV Austria Test report no. 11-U-407/SD 11-U-407/SD Date of issue 22/07/2011...
Page 18
All manuals and user guides at all-guides.com Technology Technical specifications Test data - Emissions in [mg/m³] (nominal load) Dust mg/m³ 10 / 14 14 / 15 1. Emissions values based on dry flue gas at standard temperature and pressure (0°C, 1013 mbar) with a volume content of oxygen of 13% Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
All manuals and user guides at all-guides.com Assembly Materials supplied 4 Assembly 4.1 Materials supplied The boiler comes on a pallet together with insulation, controller and accessories. Some of the components come in cardboard packaging. Boiler Flue gas pipe nozzle Insulation Ceramic fibre seal Controller...
All manuals and user guides at all-guides.com Assembly Positioning 4.2 Positioning NOTICE Damage to components if handled incorrectly ❒ Follow the transport instructions on the packaging ❒ Transport components with care to avoid damage ❒ Protect the packaging against damp conditions ❒...
All manuals and user guides at all-guides.com Assembly Setting up in the boiler room 4.3 Setting up in the boiler room 4.3.1 Remove boiler from pallet ❒ Remove the cardboard with the controller from the boiler and put in a safe place ❒...
All manuals and user guides at all-guides.com Assembly Setting up in the boiler room 4.3.3 Minimum distances in the boiler room ▪ The system should generally be set up so that it is accessible from all sides allow‐ ing quick and easy maintenance. ▪...
Page 23
All manuals and user guides at all-guides.com Assembly Before Installation ❒ Undo the retainer of the hinge pin at the top and bottom door hinge ➥ You can use two screwdrivers to gently bend the retainer plate out to loosen it ❒...
All manuals and user guides at all-guides.com Assembly Before Installation ❒ Use suitable tools (e.g. screwdriver and hammer) to push the hinge far enough to‐ ward the rear so that when the door is closed, there is slight resistance at a gap of approx.
All manuals and user guides at all-guides.com Assembly Before Installation ❒ Carefully lift out the insulating plate ❒ Turn the insulating plate by 180° and position it so that it lines up with the holes provided ❒ Re-install the radiation plate ❒...
All manuals and user guides at all-guides.com Assembly Before Installation 4.4.3 Setting and checking the seal on the doors The example below shows how to set and check the seals on the fuel loading doors. The procedure is the same for the combustion chamber door and the pre-heating chamber door! On the side with the door stop Checking the setting:...
All manuals and user guides at all-guides.com Assembly Before Installation On the side with the door handle Checking the setting: ❒ Close the door ➥ If the door can be opened with the usual force: Setting okay ➥ If the door cannot be opened with the usual force or must be forced open :push the locking plate toward the front ⇨...
All manuals and user guides at all-guides.com Assembly Installing the boiler 4.5 Installing the boiler 4.5.1 Assembly overview Insulation Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
All manuals and user guides at all-guides.com Assembly Installing the boiler Air duct system Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
Page 31
All manuals and user guides at all-guides.com Assembly Installing the boiler Item Quan‐ Description tity [units] Induced draught fan 2800U, complete, with rotation speed transducer Ceramic fibre seal 210x144x12 Flue gas pipe nozzle ø150 Blanking plug 3/4" Air duct, primary air, left and right Rubber seal for profile 12x2x15x23, L=1600 Air flap Manual controller for air control system (S-Tronic/S-Tronic Plus)
All manuals and user guides at all-guides.com Assembly Installing the boiler WOS system S3 Turbo 18-28 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
Page 33
All manuals and user guides at all-guides.com Assembly Installing the boiler Item Quan‐ Description tity [units] WOS lever, complete Handle Brass bushing SW27x20 WOS turbulator ø50x6x3x837 WOS bracket, complete 6x3 Linking plate for turbulator 6x3 Bolt ø8x16 Spacer washer M8 Split pin ø2x16 Stay tube WOS Clamping jaw...
Page 34
All manuals and user guides at all-guides.com Assembly Installing the boiler WOS system S3 Turbo 36-45 Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at...
Page 35
All manuals and user guides at all-guides.com Assembly Installing the boiler Item Quan‐ Description tity [units] WOS lever, complete Handle Brass bushing SW27x20 WOS turbulator ø50x6x3x932 WOS bracket, complete 6x3 Linking plate for turbulator 6x3 Stay tube Clamping jaw Bolt ø8x16 Split pin ø2x16 Spacer washer M8 Spacer tube ø21.3x91...
All manuals and user guides at all-guides.com Assembly Installing the boiler 4.5.2 Installing the flue gas pipe nozzle ❒ Place the ceramic fibre seal in position ❒ Position the flue gas pipe nozzle and attach it using the pre-installed spacer wash‐ ers and nuts ➥...
Page 37
All manuals and user guides at all-guides.com Assembly Installing the boiler Manual controller/ser‐ vo-motor, left ❒ Loosen the two screws at the lower and upper air duct on the right side of the boil‐ ❒ Screw in the screws at the lower and upper air duct on the left side of the boiler far enough to allow the air flap to make contact with the thread Manual controller/ser‐...
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Insert the air flaps on the pneumatic rods on the left side and secure them with split pins ➥ CAUTION: The air flaps must be situation in the same position as those on the opposite side! ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler 4.5.6 Installing the insulation NOTICE Separate parts of the boiler are fitted with a protective film. This MUST be re‐ moved before assemby! ❒ Push in the bottom insulation ❒...
Page 40
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Cut the perforated plates for the cleanout opening on both sides and bend them inward ➥ Caution: bend the plates > 100° inward! ❒ Place one large spacer washer on each of the threaded bolts to the right and the left above on the boiler ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler 4.5.7 Installing the door switch ❒ Secure the bracket with pre-mounted door switch to the upper spacer plate with two thread forming screws M4x8 4.5.8 Installing the back panel ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler 4.5.9 Aligning the insulation and attaching the controller ❒ Hang the lower spacer plate on the rivets (1) between the insulating side panels and attach with one thread forming screw (2) each ❒...
Page 43
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Insert one countersunk cross-head screw each to the left and right through the bracket and control from below ❒ Use nuts to secure the countersunk cross-head screws from the top. ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Screw in two carrying bolts (hexagonal bolts M6x100) to the left and right at the bottom rear side of the controller far enough to ensure that the controller and insu‐ lation are supported adequately 4.5.10 Installing the cleaning port door and blank cover NOTICE! Recommendation for easier maintenance: mount the cleaning port door on...
Page 45
All manuals and user guides at all-guides.com Assembly Installing the boiler S3 Turbo 18/28: ❒ Tap in a fitting grooved pin at the lower door bracket ❒ Slide the lower door bracket into the base of the boiler ➥ Insert the fitting grooved pin (1) into the insulation ➥...
Page 46
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Secure the lower door bracket ❒ At the front end of the lower door bracket, insert a hexagonal screw M6x30 from below, secure it with a nut and place a spacer washer on top ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Position magnetic latches on the inside of the insulated door at the top and bottom ❒ Mount counter plates for the magnetic latches to the left insulation side panel ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Push the flue gas temperature sensor in so that it protrudes approx. 20 mm from the housing and secure the position with the wing screw ❒ Push the boiler sensor and STL capillary into the pre-installed immersion sleeve with the pressure spring during boiler outfeed ❒...
➥ File rough edges using a half-round file and remove burrs ❒ Slide the plastic cover onto the WOS lever S3 Turbo 18/28: S3 Turbo 36/45: ❒ Remove the heat exchanger cover ❒ Hang the WOS turbulators on the linking plate of the stay tube ➥...
Page 50
All manuals and user guides at all-guides.com Assembly Installing the boiler S3 Turbo 18/28: ❒ Position the WOS turbulators at the heat exchanger pipes S3 Turbo 36/45: ❒ Position the WOS turbulators at the heat exchanger pipes ❒ Position the spacer tube at the stay tube ❒...
All manuals and user guides at all-guides.com Assembly Installing the boiler S3 Turbo 18/28: S3 Turbo 36/45: ❒ Place the heat exchanger cover on top ❒ Turn the handle of the heat exchanger cover to the right ❒ Tighten the nut below the handle 4.5.15 Installing the manual controller/servo-motors...
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Check to see if the air flaps can be opened to the right ➥ The exact position of the manual controller is set on initial start-up ⇨ See "Boiler with manual controller" [page 65] ❒...
Page 53
All manuals and user guides at all-guides.com Assembly Installing the boiler ❒ Use thread forming screws to secure the cover plate on the opposite side ❒ Attach the sticker at the end of the servo-motor cable ➥ Primary air: top servo-motor ➥...
All manuals and user guides at all-guides.com Assembly Power connection and wiring 4.6 Power connection and wiring DANGER When working on electrical components: Risk of electrocution! When work is carried out on electrical components: ❒ Only have work carried out by a qualified electrician ❒...
Page 55
All manuals and user guides at all-guides.com Assembly Power connection and wiring Connection instructions Port Cable dimensions / Specifications / Information Bus (1) Port with cable – LIYCY paired 2x2x0.5; Connecting the bus cable ❒ Warning! CAN L and CAN H must not be connected to +U Bus (2) Patch cable CAT 5 RJ45 SFTP 1:1 configuration Bus (3)
Page 56
All manuals and user guides at all-guides.com Assembly Power connection and wiring Mains connection ❒ Connect power supply at ST 18 plug (1) ➥ The power supply line (mains connection) must be fitted with a max. C13A fuse by the customer! Connecting the door switch and display ❒...
All manuals and user guides at all-guides.com Assembly Power connection and wiring Connecting the high-limit thermostat (STL) and boiler sensor ❒ Connect the STL and boiler sensor Hydraulic system Possible, non-binding planning suggestion: Weather-activated heating circuit control externally! Flow temp. sensor 1/2 External sensor Note: Please install a mixing...
All manuals and user guides at all-guides.com Assembly Power connection and wiring 4.6.2 S-Tronic Plus / S-Tronic Lambda control Power connection S-Tronic Plus: ❒ Run the cable of the flue gas temperature sensor, boiler sensor, induced draught, STL, display and door switch to the controller and connect the wiring in accord‐ ance with the operating instructions of the boiler control ➥...
All manuals and user guides at all-guides.com Assembly Power connection and wiring 4.6.3 Information on circulating pumps NOTICE According to 2012/622/EU external, wet running circulating pumps must comply with the following limit values of the Energy Efficiency Index (EEI): - Effective from 01/01/2013: Wet running circulating pumps with EEI ≤ 0.27 - Effective from 08/01/2015: Wet running circulating pumps with EEI ≤...
Page 60
All manuals and user guides at all-guides.com Assembly Power connection and wiring ❒ Attach the covers to the controller cable ducts ❒ Put on the controller cover ❒ Secure the controller cover with 2 screws and contact washers ❒ Put on the back heat insulation mat ❒...
All manuals and user guides at all-guides.com Assembly Connecting the hydraulic safety devices 4.7 Connecting the hydraulic safety devices Thermal discharge valve ▪ The thermal discharge safety device must be connected in accordance with ÖNORM/DIN EN 303-5 and as shown in the diagram above. ▪...
All manuals and user guides at all-guides.com Start-up Before commissioning / configuring the boiler 5 Start-up 5.1 Before commissioning / configuring the boiler The boiler must be adjusted to the heating system during commissioning. NOTICE Optimum efficiency and efficient, low-emission operation can only be guaranteed if the system is set up by trained professionals and the standard factory settings are observed.
All manuals and user guides at all-guides.com Start-up Initial startup 5.2 Initial startup 5.2.1 Permitted fuels Firewood Firewood up to max. 55 cm long. Water content Water content (w) greater than 15% (equivalent to wood moisture u > 17%) Water content (w) less than 25% (equivalent to wood moisture u < 33%) Note on standards Fuel acc.
All manuals and user guides at all-guides.com Start-up Initial startup Notes on ▪ When burning wood briquettes use the settings for extremely dry fuel ▪ Wood briquettes must be heated up with firewood as per EN 14961-5 (at least two layers of firewood under the wood briquettes) ▪...
All manuals and user guides at all-guides.com Start-up Initial startup Once the material in the boiler has burnt down, the boiler can be used in accordance with the operating instructions ("Operating the system" section). NOTICE If condensation escapes during the initial heat-up phase, this does not indicate a fault.
Page 66
All manuals and user guides at all-guides.com Start-up Initial startup Soft wood Hardwood Long split wood Short split wood Long split Short split wood wood w > 20% w < 20% w > 20% w < 20% w > 20% w <...
Page 67
All manuals and user guides at all-guides.com Start-up Initial startup Setting the primary air The nominal output of the boiler is set via the primary air and adjusted to the fuel used. Combustion air Effect Setting More primary air Higher flue gas temperature, Rotate manual controller clockwise greater output ("plus"...
All manuals and user guides at all-guides.com Decommissioning Mothballing 6 Decommissioning 6.1 Mothballing The following measures should be taken if the boiler is to remain out of service for several weeks (e.g. during the summer): ❒ Clean the boiler thoroughly and close the doors fully If the boiler is to remain out of service during the winter: ❒...
All manuals and user guides at all-guides.com Appendix Technical specifications - S3 Turbo with partial load values 7.2 Technical specifications - S3 Turbo with partial load values Test report data - Description S3 Turbo 28 Lambda Control Testing institute TÜV Austria Test report no.
All manuals and user guides at all-guides.com Appendix Addresses 7.3 Addresses 7.3.1 Address of manufacturer FRÖLING Heizkessel- und Behälterbau GesmbH Industriestraße 12 A-4710 Grieskirchen AUSTRIA TEL 0043 (0)7248 606 0 FAX 0043 (0)7248 606 600 INTERNET www.froeling.com 7.3.2 Address of the installer Stamp Installation Instructions S3 Turbo | M1080813_en...
Need help?
Do you have a question about the S3 Turbo 18 and is the answer not in the manual?
Questions and answers