Download Print this page

VWR PCR Workstation HEPA Quick Start Manual page 7

Hide thumbs Also See for PCR Workstation HEPA:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Step 3
Put the shelves  into the shelf brackets at
the back panel .
Remove the protective foil from the front
panel.
Put the front panel  onto the side panels .
Take care that the screw holes of the front
panel match the threaded holes in the side
panels . Hold the front panel  in place.
Screw the front panel  to both side panels 
screws 
using
3
screwdriver .
Step 4
Turn the assembled parts around 180°.
Remove the small UV tube at the back of the
top assembly.
Put the top assembly  onto the panels. Take
care not to squeeze the cables protruding from
the back panel. Screw the top assembly to the
back panel  at two positions. Use the
screws  and screwdriver  supplied.
Connect the sensor cables from the back
panel  and the top assembly . Put the
power plug of the back panel  into the power
outlet of the top assembly .
Step 5
Insert the UV tube back in place.
Cover the service access of the top assembly
 with the ventilation cover . Screw both
parts together with 6 screws . Use the screw-
driver .
Turn the system around 180° and place it on
the site of operation as needed.
each.
Use
the
Side panel 
Front panel 
Top assembly 
Top assembly 
Shelves 
Side panel 
Back panel 
Ventilation cover 

Advertisement

loading

This manual is also suitable for:

732-3409732-3410