Download Print this page

Kohler CORALAIS K-15290 Manual page 4

Bath and deck-mount bath faucet

Advertisement

Available languages

Available languages

NOTE: This frame applicable to rough (unfinished) deck
installations only.
Reset Valve Body Height: Adjust the threaded collars
until the dimension from the top of sleeve to the top of the
rough deck surface equals the the clearance requirement
you calculated in frame Fig. #5 .
NOTE: This frame applicable to rough (unfinished) deck
installations only.
Tighten mounting nuts on each valve body underneath
deck.
Solder copper tubes to valve bodies, tee and spout supply
tube.
Ensure cold supply is on right hand side.
Solder hot and cold water supply tubes to valve body
inlets.
Proceed to Section 3.
Thread 3/8" pipe plug into top of spout supply tube.
Ensure valves are closed (cold fully counterclockwise, hot
fully clockwise).
Turn on main water supply and check complete
installation for leaks with valves closed and open. Repair
as required.
Close both valves. Turn off main water supply.
WARNING: Risk of personal injury. Lines will be
pressurized. Do not lean over pipe plug when turning
or removing the plug.
Wrap a towel around the pipe plug to prevent water spray.
Water will purge from the supply tube when you remove
the plug.
Carefully back out pipe plug to relieve pressure.
Thread pipe plug into spout supply tube. Leave pipe plug
installed until spout and handle installation.
Install cardboard plaster guards over both valves and
spout supply tube. Leave in place until spout and handle
installation.
B
1012829-2-
Top Of Sleeve
Pre-Determined
Clearance
À À À À
Requirement
É É É É
À À À À
É É É É
Copper
Tube
Rough
Deck
Valve
Body
Mounting
Nut
Solder
Hot
Supply
3/8" Pipe Plug
CLOSE
HOT
4
Tile Thickness
Threaded Collar
Rough Deck
Fig. #8
Spout Supply Tube
Solder
Solder
Cold
Supply
Fig. #9
CLOSE
COLD
Fig. #10
Kohler Co., Kohler WI, U.S.A.

Advertisement

loading

This manual is also suitable for:

Coralais k-15290mCoralais k-15294Coralais k-15294m