BYD Battery-Box H 5.0 Quick Installation Manual
Hide thumbs Also See for Battery-Box H 5.0:

Advertisement

Quick Links

BYD Battery-Box HV
QUICK INSTALLATION GUIDE
Valid for Battery-Box H 5.0/7.5/10.0
Important
Skilled personnel only:
This manual and the tasks and procedures described herein are intended for use by skilled workers only.
A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and experience:
Battery-Box webpage in accordance with this document.
The system switch must be off before installing.
Please read the quick installation guide and installation manual carefully before installation.
Installation environment requirements
Max.
YES
NO
Direct sunlight
Wire Crimp
Tools
Packing list
Packing of BCU+BASE
M6 ×6
Black sealing plug ×4
Overall structure
Battery-Box H 5.0
www.eft-systems.de
Min.
RH.
+5%~+95%
YES
NO
Direct rain fall
Expansion bolt ×3
Battery-Box H 7.5
(Support->Downloads)
YES
Snow
NO
accumulation
Packing of B-Plus H 2.5
④OT terminal for P+/P-×4
⑤ Black sealing plug ×2
Battery-Box H 10.0
USA V 2
YES
Fire-resistant locations only
(Concrete/Drywall/Exterior
Siding Etc.)
NO
Flammable wall Flammable
Materials, Gas, Furnace, Etc
Power drill
Wrench
M6 ×2
BCU
B-Plus H 2.5
Base

Advertisement

loading
Need help?

Need help?

Do you have a question about the Battery-Box H 5.0 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BYD Battery-Box H 5.0

  • Page 1 BYD Battery-Box HV QUICK INSTALLATION GUIDE Valid for Battery-Box H 5.0/7.5/10.0 Important USA V 2 Skilled personnel only: This manual and the tasks and procedures described herein are intended for use by skilled workers only. A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and experience: Battery-Box webpage in accordance with this document.
  • Page 2: Installation Steps

    Installation steps Separate base and BCU Unpack Install Install battery and BCU Before installing BCU, make sure the system switch is switch off. BCU + Base connector and corners. Vertical install to protect the connector Install sealing plug after install the screws D=0~6.3cm Install Wall-mount Open the BCU cover...
  • Page 3: Connect Through Wifi

    Home 2/3/4/ Series Battery Conts = # of Modules in the HV Stack Device Information STEP 1 STEP 2 FINISH & REBOOT / BYD-CAN Installation Config Select Based on Inverter Statistics Information Country Current Alarm Asterisk(*)Indicates required fields History Alarm These parameters is important.
  • Page 5 SMA SUNNY BOY STORAGE 3.8/5.0/6.0 Battery-Box Sunny Boy Storage BYD requires setting the following parameters for SMA inverter Sunny Boy toratge Parameter Battery-Areas of application-Lower Imt deep disch.Protect area prior shutdown Battery-Areas of application-Minimum width of deep discharge protection area...
  • Page 6 With charger 13c. 13a. 13b. New battery module Charging = Green 100% = Green LED LED blinking constantly on SOC=100% Original battery system SOC=100% SOC=100% HV Charger HV Charger 13d. Battery-Box HV STEP 1 STEP 2 FINISH & REBOOT Privacy Policy Hour : Min : Day :...

This manual is also suitable for:

Battery-box h 7.5Battery-box h 10.0