Plumbing Requirements-Current Twins - Bunn CT Installation & Operating Manual

Including dv, aps/tc/ts, single cw & twins
Table of Contents

Advertisement

TWINS
These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi
(138 and 620 kPa) from a
brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345
kPa) . The water inlet fitting is
1.
Remove six screws securing rear utility cover (if
equipped). FIG 7-1
2.
Remove cap from the flared fitting on the bottom
of the center tube assembly.
3.
Flush the water line and securely attach it to the
flare fitting on the center tube assembly. FIG
7-2
4.
Turn on the water supply.
5.
Re-install rear utility cover. FIG 7-3
6.
On models with faucet, place an empty vessel
beneath the faucet and lift the handle until water
is dispensed.

PLUMBING REQUIREMENTS-CURRENT TWINS

" or larger supply line. A shut-off valve should be installed in the line before the
1
2
" flare.
3
8
FIG 7-2
Page 7
FIG 7-1
FIG 7-3
41721 111308

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CwtfC series

Table of Contents