Initial Set-Up & Programming - Bunn Dual SH Installation And Operating Manual

For use with smart funnel
Table of Contents

Advertisement

1. Grinder will not operate unless a hopper with a coffee name programmed into the chip is in place on the grinder.
2. Refer to Setup Menu "NAME HOPPER" to program hopper chip.
3. Remove top lid. Clear all foreign objects and shipping material from the hopper compartment.
4. Plug in the grinder. Place a hopper on top of the grinder with rear of hopper in front of metal gate and inside of center
divider. Push hopper straight back until fully engaged on top of grinder. When hopper is fully engaged, LCD screen will
display coffee name. To remove hopper, grasp handle and pull straight forward until rear of hopper is clear of metal
gate, then remove.
5. Fill the hopper compartments with whole bean coffee. (Capacity 5+ pounds each). The grinder is now ready for use.
INITIAL SET-UP & PROGRAMMING
5
36529 020508

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mhg

Table of Contents