Page 1
YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. Site survey: 1. Carry out a survey of the area where the 14M Hemisphere will be located, and check for any overhead/underground cables. It’s important that this is carried out to avoid ground anchors penetrating underground services, and the 14M Hemisphere coming into contact with overhead cables when inflated.
Page 2
Included with your 14M Hemisphere: The Bed The Top Part Land Operation Anchor Pegs Repair Kit in its bag in its bag Manual Pipes Soft Plays Carabiners Extra equipment needed in addition what is supplied with your inflatable: • Suitable 240v Power Supply to operate the fan Extra equipment you could consider for your new inflatable: •...
Page 3
Please see below the ground and high- 6 HIGH LEVEL ANCHOR level anchor points: POINTS IN TOTAL 46 GROUND ANCHOR POINTS IN TOTAL This inflatable can be set up and packed away by 5 persons who have had proper manual handling training and use the correct equipment to move the inflatable.
Page 4
CARABINER WEBBING CONNECTION POINTS Set up: Unfold the Top Part of the unit and inflate it. Please note the Top Part requires 2 fans. Roll the unfolded Bed inside the inflated Top structure. Insert the 2 plastic pipes into their specific place. Unfold the bed and pull the 2 filler pipes through the plastic pipes.
Page 5
Connect the webbing loops with the carabiners. Connect the sandwich Velcro flaps all around the bed STARTING FROM THE LEFT or RIGHT SIDE OF ONE OF THE STEPS. This way you will be able to match the Velcro connection exactly, without being too short or too long when you reach the other end of it. You may start inflating the bed.
Need help?
Do you have a question about the 14M Hemisphere and is the answer not in the manual?
Questions and answers