airquee Air Buildings Additional Operating Instructions

airquee Air Buildings Additional Operating Instructions

Tents, stage covers

Advertisement

AS THE OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT YOUR OWN
RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. THIS MANUAL, TOGETHER WITH
THE SUPPLIED MAIN OPERATION MANUAL, MUST BE READ BEFORE ATTEMPTING TO SETUP/USE
THE PRODUCT.

Site Survey

1. Carry out a survey of the area where the Air Building will be located, and check for any
overhead/underground cables. It's important that this is carried out to avoid ground anchors
penetrating underground services, and the Air Building coming into contact with overhead cables
when inflated.
2. You should provide an adequate power supply to the fan, this should adhere to your local power
regulations.
3. Check wind speed: It is not allowed to use an inflatable by a higher wind force than force 5 on
the Beaufort scale of 28 - 38 kmph (19-24 mph). Force 5 is a fresh breeze when small trees in
leaf begin to sway.
Air Buildings
(tents, stage covers)
Page 1 of 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Air Buildings and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for airquee Air Buildings

  • Page 1 Air Buildings (tents, stage covers) AS THE OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. THIS MANUAL, TOGETHER WITH THE SUPPLIED MAIN OPERATION MANUAL, MUST BE READ BEFORE ATTEMPTING TO SETUP/USE THE PRODUCT.
  • Page 2 Inclusions Webbing Anchoring The Inflatable(s) Standard Land Operation Repair Kit 1m Pegs Ropes Ropes in its bag(s) Pegs Manual You will need a suitable 230v/13Amp power supply to operate the fan. CAUTION! Precautions should be taken during handling and use of the product to prevent electric shock.
  • Page 3 Connect the uninflated sections with the help of the Velcro connection flap. THE FLAP WILL BE CONNECTED WHILE THE 2 SECTIONS ARE STILL IN A DEFLATED STATE. Close all deflation zips and spare filler tubes. Find the anchor points (for each section separately) highlighted below, and attach the supplied webbing ropes with the help of the carabiners.
  • Page 4 Anchoring/Ballast Weights This additional manual does not cover anchoring and inflation procedures. Please see section 12. Anchoring and use of anchor points from the supplied Land Inflatable Operation Manual. When using ballast weights, the operator will have to consider a weight of at least 160kg (352.7 lbs.) for EACH outside anchor point (lower or upper).
  • Page 5 Manual. It is the user's responsibility to determine whether there have been any such updates or amendments. Neither Airquee Ltd nor any of its directors, officers, employees or agents shall be liable in contract, tort or in any other manner whatsoever to any person for any loss, damage, injury, liability, cost or expense of any nature, including without limitation incidental, special, direct or consequential damages arising out of or in connection with the use of the Manual.

Table of Contents