Page 1
YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. Site survey: 1. Carry out a survey of the area where The Hogshead will be located, and check for any overhead/underground cables. It’s important that this is carried out to avoid ground anchors penetrating underground services, and The Hogshead coming into contact with overhead cables when inflated.
Page 2
▪ Place the two parts of “The Hogshead” next to each other. Be sure to connect the two beams that connect the two parts in the middle (one on the top of the unit, and one in the middle). The connection needs to be done with a Velcro sheet.
Page 3
▪ You should also put the roof on the part of the unit which does not have it (the roof is already on one half, and was packed like this) before it is inflated (fig. 2 & 3). It is easier this way because when it is inflated you would need a ladder, otherwise you cannot reach it.
Page 4
▪ Attach the banners of “The Hogshead” also with the help of the Velcro, unless it is not attached already, you can see this when unpacking. This banner has Velcro only on the top and bottom part of the sheet. The banner should look like this after inflation (fig.
Page 5
Assembling the metal structure ▪ After the unit is inflated you should start to assemble the metallic structure inside of the unit, one half at time. The structure for one half of the unit should look like the one in fig. 10. Fig.
Page 6
Fig. 13 Fig. 12 Make sure that the air can go through the flexi pipe: it is not twisted or blocked by anything. ▪ The fireplace is connected to the structure of the unit by 2 Velcro strips seen in figure 14. Fig.
Need help?
Do you have a question about the The Hogshead and is the answer not in the manual?
Questions and answers