Pentax MZ-S Service Manual page 15

Hide thumbs Also See for MZ-S:
Table of Contents

Advertisement

2 2 2 2 - - - - 5 5 5 5 . Installation of 0
. Installation of 0- - - - D201.
. Installation of 0
. Installation of 0
[Note] When replacing N300, cut the one lead on N300 at first.(Apply bond.)
1) Solder 2 lead wires and arrange them in front of the camera as shown in Figure below.
N300 (0-D201)
Black Red
2) Tighten the screws by numerical (①TY-CNL-D1.7x4.0 x4、②CNL-D1.7x4.0 x4.) and
diagonal order. (Do not use wrong one and not tighten the screw at wrong position.)
3) Position the land portions of 0-T100 Battery grip and adhere contact surface with DT
(5x10).
D201.
D201.
D201.
(N300)
27640 -14/34-
0-D201

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents