Download Print this page

Tripp Lite N48M Series Installation Manual page 3

Ultra high-density fiber panel all-in-one solution
Hide thumbs Also See for N48M Series:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
3
Place the panel into position in an enclosure or open
frame rack. Align the mounting holes and use rack-
mounting screws (2 per side, not included) to secure the
unit.
3
5
Locate the appropriate MPO cable. Remove the Velcro strap, uncoil and pull cable, as required. Excess cable slack can be
recoiled inside the panel.
Cables are labeled
per port in both
meters and feet.
5
4
To access the MPO cables, untighten the two handscrews
located on the rear of the unit
and flip down the rear access plate
4
Available rear-to-front
cable access.
3
, lift the top panel
A
.
C
B
A
B
C

Advertisement

loading