Carrier 38AU Installation, Start-Up And Service Instructions Manual page 15

Air cooled condensing units 60 hz with puronr (r-410a) refrigerant
Table of Contents

Advertisement

CKT
2
CKT
1
CKT
1
Fig. 6 - - 38AUD Service Valve Locations
Plan the Circuit 1 and Circuit 2 tubing segments carefully,
mark each segment and check constantly as piping
systems are assembled to avoid piping errors.
38AUD
unit
cannot
single-circuit/tandem system.
Connecting 40RU to 38AUD: The 40RU fan coil in sizes
16, 25 and 28 is a face-split coil design that also has its
circuits designated as 1 and 2. See Fig. 7. Note that the
lower coil segment changes as the arrangement of the
40RU changes. In a vertical arrangement, the 40RU's
lower coil segment is segment 2; this segment should be
connected to the 38AUD's Circuit 1. In a horizontal
arrangement, the 40RU's lower segment is now segment
1; this segment should be connected to the 38AUD's
Circuit 1.
Note that refrigerant suction piping should be insulated.
40RU
Cooling
Arrangement
Stage
Y1
Vertical
Y2
Y1
Horizontal
Y2
Install Filter Drier(s) and Moisture Indicator(s) —
Every unit MUST have a filter drier in the liquid line.
38AUD models require two filter driers (one in each
liquid line). Locate the filter drier(s) at the indoor unit,
close to the evaporator coil's thermal expansion valve
(TXV) inlets.
LIQUID LINE
SIZE (in.)
1
/
2
5
/
8
38AUD units require TWO sets of parts.
CKT
2
Circuit 2
Connections
Circuit 1
Connections
C10355
be
field-piped
as
40RU Coil
Connect to
Segment
38AUD
2
Circuit 1
1
Circuit 2
1
Circuit 1
2
Circuit 2
Table 9 – Refrigerant Specialties Part Numbers.
LIQUID LINE
SOLENOID VALVE (LLSV)
EF680035
EF680036
38AU units include one (38AUZ) or two (38AUD)
Puron-duty filter drier(s), shipped in cartons attached to
the unit basepan. Remove the filter drier(s) and prepare to
install in the liquid line(s) at the evaporator coil. Do not
remove connection fitting plugs until ready to connect and
braze the filter drier into the liquid line position.
1
VERTICAL INSTALLATION
a
FIRST ON/LAST OF F = 1
HORIZONTAL INSTALLATIO N
Fig. 7 - - Typical Evaporator Coil Connections (40RU)
Table 8 – Puron-duty Filter Drier(s)
Model-Size
Qty
38AUZ*16
1
38AUZ*25
1
38AUD*16
2
38AUD*25
2
Installation of liquid line moisture indicating sightglass in
each circuit is recommended. Locate the sightglass(es)
between the outlet of the filter drier and the TXV inlet.
Refer to Table 9 for recommendations on refrigeration
specialties.
LLSV
SIGHT
COIL
GLASS
EF680037
KM680004
EF680037
KM680005
15
2
FIRST ON/LAST OFF = 2
2
1
Liquid
Desiccant
Line OD
Volume
Number Ref
5
/
-in
30 cu. in.
KH43LG087
8
5
/
-in
30 cu. in.
KH43LG087
8
1
/
-in
16 cu. in.
KH43LG085
2
1
/
-in
16 cu. in.
KH43LG085
2
FILTER
DRIER
provided with unit
see Table 8
C10071
Part

Advertisement

Table of Contents
loading

This manual is also suitable for:

38au series38auz 16 series38aud 16 series38auz 25 series38aud 25 series

Table of Contents