I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO.
INDOOR: AIR HANDLER MANUFACTURER
MODEL NO.
ADDITIONAL ACCESSORIES
II. PRE-START-UP
OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE?
IF SO, WHERE:
WILL THIS DAMAGE PREVENT UNIT START-UP?
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
HAS THE GROUND WIRE BEEN CONNECTED?
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
CONTROLS
ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING CONNECTIONS MADE AND CHECKED?
(Y/N)
ARE ALL WIRING TERMINALS (including main power supply) TIGHT?
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?
INDOOR UNIT
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?
ARE PROPER AIR FILTERS IN PLACE?
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?
DO THE FAN BELTS HAVE PROPER TENSION?
HAS CORRECT FAN ROTATION BEEN CONFIRMED?
PIPING
ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR COILS AS REQUIRED?
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, OUTDOOR AND INDOOR COILS,
TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS
WITH A LEAK DETECTOR?
LOCATE, REPAIR, AND REPORT ANY LEAKS.
HAVE LIQUID LINE SERVICE VALVES BEEN OPENED?
HAVE SUCTION SERVICE VALVES BEEN OPENED?
CHECK VOLTAGE IMBALANCE
LINE-TO-LINE VOLTS:
(AB + AC + BC)/3 = AVERAGE VOLTAGE =
MAXIMUM DEVIATION FROM AVERAGE VOLTAGE =
VOLTAGE IMBALANCE = 100 X (MAX DEVIATION)/(AVERAGE VOLTAGE) =
IF OVER 2% VOLTAGE IMBALANCE, DO NOT ATTEMPT TO START SYSTEM!
CALL LOCAL POWER COMPANY FOR ASSISTANCE.
III. START UP

START-UP CHECKLIST

(Y/N)
(Y/N)
(Y/N)
(Y/N)
AB
V
AC
CL-1
SERIAL NO.
SERIAL NO.
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
V
BC
V
V
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
V