Start-Up Of The Control System - Graf ONE2CLEAN Manual

Table of Contents

Advertisement

START-UP OF THE CONTROL SYSTEM

3
After the system is connected to the power supply, a short system test is run, during which time the LED light is red. The
LED then becomes green when the start-up phase is completed.
During the system test, the notification "SYSTEM TEST ... OK", the program version, and serial number of the control
system appear for a short time. Following this, the current operating status of the system is displayed. After the system
test is complete, the date and the current time should be checked and adjusted if necessary (see Section 4.2.3).
After checking the date/time, a functional check of the system components must be carried out. This check can only be
carried out if the necessary air hoses are connected. The check should be carried out via the menu point "manual mode"
in the control system, which is intended for this purpose. The individual parts of the system are tested for functionality.
After a successful check, the system is reset to automatic mode.
CAUTION: The clear water siphon only functions when the containers are filled.
If the date and time are not set correctly, operating faults will be stored with the incorrect time information.
8
Graf UK Ltd

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ONE2CLEAN and is the answer not in the manual?

Questions and answers

Table of Contents