Install Cable Management On A Chassis - Cisco 8800 Series Hardware Installation Manual

Hide thumbs Also See for 8800 Series:
Table of Contents

Advertisement

Unpack and Install the Chassis
1
2
3
Step 4
Use the crimping tool to carefully crimp the wire receptacle around the wire; this step is required to ensure a
proper mechanical connection.
Step 5
Insert the two screws through the holes in the grounding lug. Ensure that the grounding lug does not interfere
with other router hardware components.
Step 6
Use the Phillips screwdriver to carefully tighten the screws to 60 in-lbs 6.7 (N-m) of torque until the grounding
lug is held firmly to the chassis. Do not overtighten the screws.
Step 7
Connect the opposite end of the grounding wire to the appropriate grounding point at your site to ensure an
adequate chassis ground.
What to do next
Attach the chassis doors.

Install Cable Management on a Chassis

Before you begin
The chassis must be installed and secured to the rack.
Required tools and equipment:
• Phillips screwdriver with a torque capability (customer supplied)
• Cable management brackets (8818-CBLMGMT,8812-CBLMGMT, 8808-CBLMGMT, or
Procedure
Step 1
Position one of the cable management brackets on the vertical mounting bracket so that the screw holes are
aligned.
Locate ground
Prepare lug
Ground the chassis
8804-CBLMGMT).
Note
The cable management assembly is shipped with the chassis.
Install Cable Management on a Chassis
4
Align the lug holes
5
Tighten the screws
Hardware Installation Guide for Cisco 8800 Series Routers
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8818881288088804

Table of Contents