10 Finishing the outdoor unit installation

10.1 To check the insulation resistance of the compressor

10.2 To finish the outdoor unit installation

ERLA11~16DAV3+W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
NOTICE
If, after installation, refrigerant accumulates in the compressor, the insulation
resistance over the poles can drop, but if it is at least 1 MΩ, then the unit will not
break down.
Use a 500 V mega-tester when measuring insulation.
Do NOT use a mega-tester for low voltage circuits.
1 Measure the insulation resistance over the poles.
If
≥1 MΩ
<1 MΩ
2 Turn ON the power and leave it on for 6 hours.
Result: The compressor will heat up and evaporate any refrigerant in the
compressor.
3 Measure the insulation resistance again.
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
INFORMATION
For the requirements of the refrigerant piping insulation, see
piping
insulation" [
1 Insulate and fix the refrigerant piping and cables as follows:
d
c
a
b
g
a Gas pipe
b Gas pipe insulation
c Interconnection cable
d Field wiring (if applicable)
e Liquid pipe
f Liquid pipe insulation
g Finishing tape
2 Install the service cover.
10
Finishing the outdoor unit installation
|
Insulation resistance is OK. This procedure is
finished.
Insulation resistance is not OK. Go to the next step.
4
 92].