MASSEY FERGUSON 6400 Workshop Service Manual page 146

Table of Contents

Advertisement

Perkins/GTA2520 engine separation
Final steps
Note
Final steps are not especially difficult.
They should be carried out in the reverse order to
preliminary steps. However, it will be necessary during
reassembly to carry out the tightening torques,
adjustments and tests described below.
Tightening torques
As required:
- front cab screws (see chapter 12)
- screw (2) of the connector (1) on the main harness
(Perkins EEM engine)
torque of 2.82–3.15 Nm.
Topping-up
- of coolant to the maximum level marked on the
radiator and expansion tank
Tests
- air conditioning system (if fitted—see chapter 12)
- cab suspension (if fitted—see chapter 12)
- all mechanical, hydraulic, electrical and electronic
functions subject to operations
Checking tightness
- of hydraulic unions
2B11.22
¤
H
(Fig. 19
and
Fig.
26) to a
(Fig.
27).
Fig. 26
Fig. 27
Massey Ferguson 6400 - Issue 4.a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

644564556460646564706475 ... Show all

Table of Contents