DAB E-BOX 2G M Instruction For Installation And Maintenance page 44

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 41
8. CONNECTION DIAGRAM REFERENCE
To allow the wire to be inserted in the spring terminals, press the button with
a screwdriver. Ensure that the wire is completely inserted, after having released
the button!
Ref.
1
QS1 – power supply line insulating switch
2
Power supply line connections
3
Earthing connection
4
Pump P1 and P2 control contactors
5
Pump P1 connection
6
Pump P2 connection
7
K-K – Thermal protection input for the motor
8
FU3 – fuse protecting the transformer against incorrect connection of motor cables
9
A-B-C – Terminals connecting digital inputs for level or pressure control
10
R-N – Terminals connecting digital alarm inputs
11
H1 – Terminal connecting pressure sensor analog input
12
Q1-Q2-Q3 – Terminals connecting the alarms
13
FU1-FU2 – Fuses protecting the transformer against short circuits
14
FU5 – Fuse protecting pump P2
15
FU4 – Fuse protecting pump P1
16
Connector for power supply to EXP board (optional)
17
13-14 – Connecting terminals for indicating pumps being fed (P1 and P2)
ENGLISH
15
16
1
17
5
2
7
3
Function
40
13
14
4
17
12
6
7
8
9
10
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-box 2g tE-box 2d m/tE-box 2d 40mf

Table of Contents