Download Print this page

Ingeteam INGECON SUN STORAGE 1Play TL M Technical Manual For Installations page 9

Hide thumbs Also See for INGECON SUN STORAGE 1Play TL M:

Advertisement

Operating mode
The ISS 1Play TL M manages the energy flows in the installation in line with the following principles:
Photovoltaic energy is used as a priority to supply loads and to charge the battery.
If the photovoltaic energy is insufficient to power loads, the battery provides the remainder.
If the state of charge (SOC) of the battery reaches a minimum value established by the user SOC On,
the diesel genset will be connected. It will remain connected until the battery reaches the SOC Off.
If the diesel genset is not operational, the ISS 1Play TL M powers loads until the battery is completely
flat (SOC Descx). At this point, the loads are no longer powered until SOC Recx is reached using
photovoltaic energy of the ISS 1Play TL M.
Battery charging permitted
only from PV source
Battery charging permitted
from PV source and/or
diesel genset
Technical Guide
DISCHARGING
Connection of the diesel
genset
End of supply
(system stoppage)
04/06/2021
INGECON SUN STORAGE 1Play TL M
CHARGING
Disconnection of the diesel
genset
Supply restart
9/10

Advertisement

loading