Installation - Saeco D.A. 10P Plus Instructions For Installation Manual

Vending machine for hot beverages
Table of Contents

Advertisement

Available languages

Available languages

English
3.7
Handling the unpacked machine
At least four persons, one at each corner of the machine, should manually remove the machine from the platform. Mecha-
nical lifting or forklift clamps could damage the housing of the machine.
3.8
Disposing packaging material
It is advised to retain the packaging material for future shipping or transport. If the packaging material is to be discarded,
it is recommended to recycle these materials at your local recycling center. Dispose of the material only in conformity with
regulations in force in your country.

4 - INSTALLATION

4.1
General precautions
NOTE: Before reading this paragraph, you should read carefully the instructions contained in Paragraph
1.1 "General safety precautions", so that you are aware of the safety conditions required prior to
operating this machine.
4.2
Required location conditions
It is recommended to install the machine in an enclosed area with the following conditions:
- Room temperature:
- Maximum humidity:
NOTE: Always check the electrical supply to make sure that it corresponds to the data given on the rating plate.
Do not install the machine in areas where water jets are used for cleaning.
Do not install the machine outdoors.
Do not install the machine in areas where there are strong magnetic fields or intense vibrations.
4.3
Space around the machine
10
10°C - 40°C
90%
Allow enough distance between the machine and surrounding walls or
other machines (Fig. 5).
Fig.5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saeco d.a. 10p instantSaeco d.a. 10p standard

Table of Contents