Trillium FLOWAY Instructions Manual For Installation, Operation And Maintenance

Trillium FLOWAY Instructions Manual For Installation, Operation And Maintenance

Table of Contents

Advertisement

Vertical Turbine Pumps
Vertical Turbine Pumps
2001299 - VTP- IOM
2001299 - VTP- IOM
FLOWAY
Vertical Turbine Pumps
INSTALLATION, OPERATION AND MAINTENANCE
INSTALLATION, OPERATION AND MAINTENANCE
Vertical Turbine Pumps
Installation, Operation, & Maintenance Manual
"Copyright © 2019, Trillium Pumps USA, Inc.
Copyright © 2014, Weir Floway, Inc.
Trillium Pumps USA, Inc. ("the Company") is the owner of the copyright and confidential information in this document. The document may contain information that is private, confidential or
privileged. The document must not be copied in whole or part, in any form or by any means, and the information in it must not be disclosed to any person, or used for any other purpose other
Floway is a registered trademark of Weir Floway, Inc.
"Copyright © 2019, Trillium Pumps USA, Inc.
than the specific purpose for which it is provided, without the prior consent of the company".
Weir Floway, Inc. ("the Company") is the owner of the copyright and all confidential information in this
Trillium Pumps USA, Inc. ("the Company") is the owner of the copyright and confidential information in this document. The document may contain information that is private, confidential or
privileged. The document must not be copied in whole or part, in any form or by any means, and the information in it must not be disclosed to any person, or used for any other purpose other
document. The document may contain information that is private, confidential or privileged. The document
than the specific purpose for which it is provided, without the prior consent of the company".
must not be copied in whole or in part, in any form or by any means, and the information in it must not be
INSTRUCTION MANUAL FOR
INSTRUCTION MANUAL FOR
®
PUMPS
AND LIST OF PARTS
AND LIST OF PARTS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLOWAY and is the answer not in the manual?

Questions and answers

allen
February 25, 2025

Need parts breakdown for the following Floway pump, Size 14, Serial 74-3175-3, Type DKH

Subscribe to Our Youtube Channel

Summary of Contents for Trillium FLOWAY

  • Page 1 Copyright © 2014, Weir Floway, Inc. Trillium Pumps USA, Inc. (“the Company”) is the owner of the copyright and confidential information in this document. The document may contain information that is private, confidential or privileged. The document must not be copied in whole or part, in any form or by any means, and the information in it must not be disclosed to any person, or used for any other purpose other Floway is a registered trademark of Weir Floway, Inc.
  • Page 2 December 12, 2014 February 20, 2020 ERCO-1005648 May 13, 2020 ERCO-1005802 II | IM-112 DECEMBER 2019 II | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page i Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 3: Table Of Contents

    Solid Shaft Driver Installation ......................... 27 Impeller Adjustment - General ........................29 Document Name: 2001299-VTP-IOM-EN Page ii Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 III | IM-112 DECEMBER 2019 III | IM-112 DECEMBER 2019...
  • Page 4 11.3 Returning Parts .............................. 57 12 Parts List ..........................58 Document Name: 2001299-VTP-IOM-EN Page iii Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 IV | IM-112 DECEMBER 2019 IV | IM-112 DECEMBER 2019...
  • Page 5 Figure 12-9:Type VC ..............................66 Figure 12-10:Type VC ..............................67 Document Name: 2001299-VTP-IOM-EN Page iv Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 V | IM-112 DECEMBER 2019 V | IM-112 DECEMBER 2019...
  • Page 6 Table 8-1:Recommended Torque Values for Typical Fasteners..................51 Table 10-1:Troubleshooting Chart ..........................55 Document Name: 2001299-VTP-IOM-EN Page v Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 VI | IM-112 DECEMBER 2019 VI | IM-112 DECEMBER 2019...
  • Page 7: Introduction

    Scope of the Manual This manual describes the installation, operation, and maintenance of Vertical Turbine Pumps. The manual must be used as a reference only, in conjunction with any Trillium Pumps USA product-specific information and training. Intended Audience This manual is intended for: •...
  • Page 8: Glossary Of Acronyms

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Introduction Glossary of Acronyms Acronym Description ATEX Equipment for Potentially Explosive Atmospheres Electromagnetic Compatibility Inside Diameter Installation, Operation, &...
  • Page 9: Safety

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Safety Safety DANGER DANGER Study this instruction manual carefully. Failure to follow the instructions can cause serious personal injury, death, or property damage.
  • Page 10: Safety Symbols

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Safety Safety Symbols Illustration Safety Tool Description DANGER Indicates a hazard with a high level of risk which, if DANGER not avoided, could result in death or catastrophic equipment damage.
  • Page 11 Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Safety DANGER RISK ASSESSMENT A comprehensive risk assessment of the installation site, pump equipment, and pumping system must be completed prior to receiving the equipment.
  • Page 12 Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Safety DANGER VAPORIZATION • Do not operate the pump at low or zero flow conditions, or under any circumstances that causes the pumped liquid to vaporize.
  • Page 13: Intended Use

    • As Trillium Pumps USA does not test the parts and accessories sourced from other vendors, the installation of such parts and accessories may adversely affect the performance and safety features of the products.
  • Page 14: Markings And Approvals

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Safety Markings and Approvals WARNING EXPLOSIVE ATMOSPHERES Prior to installing any equipment, determine the hazardous area classification and any other requirements applicable to the specific location and confirm all equipment has the required certifications.
  • Page 15: General Information And Description

    General Information and Description General Information Floway Pump's standard practice is to ship close coupled pumps assembled. Where long pump lengths, shipping limitations, handling limitations and headroom limitations prevent complete assembly, we will ship the pump sub-assembled. It is the responsibility of the installer to ask for assistance should it be required to properly assemble and install the pump.
  • Page 16: Figure 3-1:Major Vtp Components

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps General Information and Description Refer to Figure 3-1 for one possible variant. Pumps less than 30 feet in length are typically shipped fully assembled and ready for installation.
  • Page 17: Drivers

    • Suction bell or case which directs the fluid into the first stage impeller. • Bearings located in the suction bell (or case) and each bowl. A separate instruction manual is available which provides construction details and repair instructions for Floway bowl assemblies. 3.3.5 Suction Vessel The suction vessel may consist of a barrel with or without suction fitting, to connect to customers piping arrangement, or a storage tank with suitable opening to mount the pump.
  • Page 18: Pre-Installation

    Storage NOTICE These provisions are applicable to Trillium Pumps USA pump components only. For the appropriate storage procedures for non-Trillium items (for example, drivers, mechanical seals, auxiliary equipment, etc.), refer to specific requirements from the manufacturer.
  • Page 19: Uncrating And Cleaning

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Pre-installation Uncrating and Cleaning If the unit appears undamaged proceed to uncrate following the instructions given below: CAUTION DEFLECTION OF THE PUMP To prevent deflection of the pump components, take appropriate precaution to prevent the...
  • Page 20: Lifting Pump Components And Pump Assemblies

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Pre-installation WARNING LIFTING DRIVERS AND AUXILIARY EQUIPMENT Refer to the manufacturer’s instruction manual for proper lifting techniques of all drivers and auxiliary equipment.
  • Page 21: Figure 4-1:Lifting Pumps From Horizontal To Vertical Position

    (for pump lengths up to 40 feet) Document Name: 2001299-VTP-IOM-EN Page 15 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 15 | IM-112 DECEMBER 2019 15 | IM-112 DECEMBER 2019...
  • Page 22: Figure 4-2:Fabricated Head Lifting

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Pre-installation Max. lift angle Lifting devices must pass from vertical through center opening of shall not top plate and wrap around exceed 45°...
  • Page 23: Installation Equipment And Tools

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Pre-installation Installation Equipment and Tools Do not attempt installation without proper equipment. The following list covers the major equipment and tools required for installation: 1.
  • Page 24: Figure 4-5:Shaft Locking Plate

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Pre-installation Figure 4-5: Shaft Locking Plate NOTICE Shaft type seals are shipped separately and are not installed in the seal housing. A tag is supplied indicating that the seal is not installed.
  • Page 25: Installation

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Installation Installation WARNING PERSONAL INJURY The pump must be installed, operated and maintained only by personnel who are trained and have sufficient knowledge about the hazards that may occur during such work.
  • Page 26: Suction Barrel Installation

    2. If a soleplate is used, level the mounting surface then grout and anchor in place. 20 | IM-112 DECEMBER 2019 20 | IM-112 DECEMBER 2019 20 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 20 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 27 Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Installation 3. Clean the pump discharge flange. NOTICE • All machined surfaces are coated with rust preventative prior to shipment. This must be completely removed along with any paint overspray or rust which might be on the machined faces.
  • Page 28: Vertical Turbine Can Pump Installation (Type Vs6)

    22 | IM-112 DECEMBER 2019 22 | IM-112 DECEMBER 2019 22 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 22 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 29: Figure 5-2:Suction And Discharge Identification - Type Vc Discharge Head

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Installation NOTICE • Type VC discharge heads have both suction and discharge flanges. Therefore, it is important to make sure that the suction piping is connected to the suction side of the pump.
  • Page 30: Hollow Shaft Driver Installation

    Figure 5-3 on page 25). 24 | IM-112 DECEMBER 2019 24 | IM-112 DECEMBER 2019 24 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 24 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 31: Figure 5-3:Motor Guide Bushing Location

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Installation Lower guide bushing located inside holllow shaft at bottom of motor Figure 5-3: Motor Guide Bushing Location 5.
  • Page 32: Figure 5-4:Hollow Shaft Driver Clutch

    “Impeller Adjustment - General” on page 29 for impeller adjustment. 21. Adjust mechanical seal after adjusting impellers. Document Name: 2001299-VTP-IOM-EN Page 26 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 26 | IM-112 DECEMBER 2019...
  • Page 33: Solid Shaft Driver Installation

    (refer to Figure 5-5 on page 28). 27 | IM-112 DECEMBER 2019 27 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 27 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 34: Figure 5-5:Driver Half Coupling Correctly Positioned

    Do not touch the rotating elements with hands to establish the direction of rotation. Visually confirm the direction of rotation. 28 | IM-112 DECEMBER 2019 28 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 28 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 35: Impeller Adjustment - General

    Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps 2001299 - VTP- IOM Vertical Turbine Pumps Installation CAUTION DAMAGE TO THE PUMP • Before jogging the motor make sure the coupling halves are not touching and the motor shaft end is sufficiently clear of the pump shaft and adjusting nut, and the driver can rotate freely without rotating the pump.
  • Page 36: Figure 5-6:Types Of Impellers

    30 | IM-112 DECEMBER 2019 30 | IM-112 DECEMBER 2019 30 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 30 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 37: Impeller Adjustment - Hollow Shaft Driver

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Installation • Use the highest discharge head that the unit is expected to operate against to calculate the impeller adjustment value.
  • Page 38: Impeller Adjustment - Solid Shaft Driver (Thrust Bearing In Driver)

    “Impeller Adjustment - General” on page 32 | IM-112 DECEMBER 2019 32 | IM-112 DECEMBER 2019 32 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 32 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 39: Mechanical Seal

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Installation 5. Lock the adjusting nut with the lockscrew(s) inserted down through the holes in the adjusting nut and threaded into the thrust bearing clutch.
  • Page 40: Commissioning And Operation

    These limits are dependent on the pump type, configuration and materials used. If there is any doubt about the suitability of the product for the intended application, contact Trillium Pumps USA, referencing the serial number.
  • Page 41: Pre-Starting Checks

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Commissioning and Operation WARNING HOT FLUIDS AND SURFACES Fluids and surfaces may become hot during operation (for example, hot pumpage, pump surfaces, thrust bearing surfaces, thrust bearing oil, driver oil, driver surfaces, packing leakage, etc.).
  • Page 42: Initial Start-Up

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Commissioning and Operation Initial Start-up WARNING PERSONNEL INJURY Personnel injury or illness may result from contact with rotating parts, seal leakage or spray from the rotating shaft.
  • Page 43: Lineshaft Lubrication

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Commissioning and Operation Lineshaft Lubrication 1. Open Lineshaft Bearings: are lubricated by the pumped fluid. Close coupled units (less than 40 feet long) usually do not require pre or post lubrication.
  • Page 44: Table 6-3:Recommended Greases

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Commissioning and Operation Recommended greases for packing boxes and suction bearings are given in Table 6-3. Union Oil Grades Other...
  • Page 45: Maintenance

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Maintenance Maintenance DANGER LOCKOUT-TAGOUT (LOTO) • Prior to allowing any checking, maintenance, or other work on the equipment, all hazardous energy sources (for example, electrical, mechanical, hydraulic, pneumatic, etc.) must be isolated using an appropriate lockout-tagout procedure.
  • Page 46: Periodic Inspection, Condition Monitoring, And Preventative Maintenance

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Maintenance Periodic Inspection, Condition Monitoring, and Preventative Maintenance • Periodic inspections (ideally once a month) and preventative maintenance are recommended as the best means of preventing breakdown and keeping maintenance costs at a minimum.
  • Page 47: Start-Up With New Packing

    It is not designed as a primary seal and must not be used as such. 41 | IM-112 DECEMBER 2019 41 | IM-112 DECEMBER 2019 41 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 41 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 48: Mechanical Seal Maintenance

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Maintenance Mechanical Seal Maintenance CAUTION DAMAGE DUE TO MECHANICAL SEAL TABS • For pumps fitted with mechanical seals always follow the seal manufacturer’s instruction manuals.
  • Page 49: Figure 7-1:Effect Of Adjusting Semi-Open Impellers

    Figure 7-1: Effect of Adjusting Semi-open Impellers Document Name: 2001299-VTP-IOM-EN Page 43 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 43 | IM-112 DECEMBER 2019 43 | IM-112 DECEMBER 2019...
  • Page 50: Pump Lubrication

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Maintenance Figure 7-1 on page 43 indicates the approximate effect of raising semi-open impellers from their ideal (a) operating position.
  • Page 51: Repairs

    • The repair of vertical turbine pumping units is best handled by an experienced pump service center. • Trillium Pumps USA has a worldwide network of service centers where skilled machinists and mechanics can repair and rebuild any pump unit to “as-new” condition. For information regarding the nearest service center, contact Trillium Pumps USA by email at, floway@trilliumflow.com.
  • Page 52: Equipment And Tools

    Unscrew and remove the headshaft from the shaft coupling inside the discharge head. 46 | IM-112 DECEMBER 2019 46 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 46 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 53 Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Repairs b. Solid Shaft Driver: Unbolt the driver coupling to lower the pump shaft. Remove coupling components (driver half coupling may be left in place, ensure it is safely secured to the driver shaft).
  • Page 54: Figure 8-1:Correct Positioning Of Wrenches On Shafting

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Repairs 17. For open lineshaft and enclosed lineshaft construction do the following: a. Open Lineshaft Construction: each time a lineshaft coupling is exposed by removing a length of the column pipe, the lineshaft and the coupling must be removed by holding the coupling and turning the upper lineshaft in right hand direction (line shaft threads are left hand).
  • Page 55: Inspection And Cleaning

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Repairs 1. Column Pipe 2. Pipe Coupling 3. Enclosing Tube 4. Lineshaft Bearing 5. Lineshaft 6. Lineshaft Coupling Figure 8-2: Enclosing Tube and Lineshaft 18.
  • Page 56: Replacement Parts

    0.025" (13+12 = 25 thousands of an inch). Replacement Parts Replace parts showing signs of damage, cracks or excessive wear. Use only genuine Floway parts for replacements. DANGER GENUINE OEM PARTS •...
  • Page 57: Assembly

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Repairs Assembly Before proceeding with assembly, thoroughly clean and check all the threads, registers and mating faces for burrs.
  • Page 58: Tension Nut Assembly And Adjustment

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Repairs 8.10 Tension Nut Assembly and Adjustment Enclosed lineshaft units use a tension nut which is at the top of the enclosing tube and must be tightened for proper operation.
  • Page 59: Decommissioning And Disposal

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Decommissioning and Disposal Decommissioning and Disposal This section describes decommissioning and disposal of the complete pump unit. DANGER LOCKOUT-TAGOUT (LOTO) •...
  • Page 60 Furthermore, used parts may be unsafe and not fit for any use due to corrosion, wear, or other damage. To decommission and dispose of a pump unit, Trillium Pumps USA recommends the following steps: NOTICE For drivers, mechanical seals, and other auxiliary equipment, refer to the respective manufacturer's IOM for further details regarding decommissioning and disposal.
  • Page 61: Troubleshooting

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Troubleshooting Troubleshooting Refer to Table 10-1 for troubleshooting instructions. Condition Probable Cause Remedy Pump not running. 1 Motor overload protection contacts open.
  • Page 62 2 Change to corrosion resistant materials. Table 10-1: Troubleshooting Chart (Continued) 56 | IM-112 DECEMBER 2019 56 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 56 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 63: Parts

    • As Trillium Pumps USA does not test the parts and accessories sourced from other vendors, the installation of such parts and accessories may adversely affect the performance and safety features of the products.
  • Page 64: Parts List

    Vertical Turbine Pumps Vertical Turbine Pumps Vertical Turbine Pumps 2001299 - VTP- IOM 2001299 - VTP- IOM 2001299 - VTP- IOM Vertical Turbine Pumps Parts List Parts List NOTICE • Separate instruction manual available covering bowl assembly construction and parts list. •...
  • Page 65: Vertical Turbine Pumps

    Figure 12-2: Type A - Enclosed Lineshaft 59 | IM-112 DECEMBER 2019 59 | IM-112 DECEMBER 2019 59 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 59 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 66: Figure 12-3:Type Cf - Open Lineshaft

    Figure 12-3: Type CF - Open Lineshaft 60 | IM-112 DECEMBER 2019 60 | IM-112 DECEMBER 2019 60 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 60 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 67: Figure 12-4:Type F And Vf - Open Lineshaft

    (illustrated with adjustable flange coupling without spacer and standard packing box) 61 | IM-112 DECEMBER 2019 61 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 61 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 61 | IM-112 DECEMBER 2019...
  • Page 68: Figure 12-5:Type Af - Open Lineshaft

    (illustrated with motor stand, spacer coupling, FF-2 seal and seal housing) 62 | IM-112 DECEMBER 2019 62 | IM-112 DECEMBER 2019 62 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 62 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 69: Figure 12-6:Type A - Open Lineshaft

    (illustrated with column and hi-pressure packing box) 63 | IM-112 DECEMBER 2019 63 | IM-112 DECEMBER 2019 63 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 63 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 70: Figure 12-7:Type Vu - Enclosed Lineshaft

    (illustrated with manually operated lubrication assembly) 64 | IM-112 DECEMBER 2019 64 | IM-112 DECEMBER 2019 64 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 64 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 71: Figure 12-8:Injection Lubrication Arrangement

    Figure 12-8: Injection Lubrication Arrangement 65 | IM-112 DECEMBER 2019 65 | IM-112 DECEMBER 2019 65 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 65 of 67 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 72: Figure 12-9:Type Vc

    (illustrated with adjustable flanged coupling with spacer and mechanical seal) 66 | IM-112 DECEMBER 2019 Document Name: 2001299-VTP-IOM-EN Page 66 of 67 66 | IM-112 DECEMBER 2019 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014 66 | IM-112 DECEMBER 2019...
  • Page 73: Figure 12-10:Type Vc

    (illustrated with TSO thrust bearing, motor stand, and flexible driver coupling) Document Name: 2001299-VTP-IOM-EN Page 67 of 67 67 | IM-112 DECEMBER 2019 67 | IM-112 DECEMBER 2019 Revision 3 Copyright © 2014, Weir Floway, Inc. All Rights Reserved. Issue Date: December 12, 2014...
  • Page 74 Trillium Pumps USA Fresno California 93706 Tel: (559) 442 - 4000 Fax: (559) 442 - 3098 www.trilliumflow.com...