New Holland TD5010 Service Manual page 39

Table of Contents

Advertisement

22
-
Refit the brake piping support and the two retain‐
ing bolts.
-
Refit the condenser, air cooler and radiator
pipes.
-
Refit the dryer filter together with its support and
piping, tightening the two retaining bolts.
-
Refit the bonnet support, tightening the retaining
bolts.
-
Refit the support with the fuse-holder box on the
bonnet support, tightening the two retaining
bolts.
-
Refit the support together with the relays protect‐
ing the system on the bonnet support, fitting the
two retaining bolts.
-
Refit the brake fluid reservoir onto the support
and the two retaining clips.
-
Refit the silencer together with the exhaust pipe.
-
Secure the silencer to the exhaust manifold with
the four nuts and connect the air filter dust ex‐
tractor pipe to the silencer exhaust, inserting the
retaining clamp.
-
Refit the three rear retaining bolts of the exhaust
silencer.
-
Fit the cab heater delivery and return pipes and
insert the associated clamps.
-
Refit the fitting of the hose delivering power
steering oil to the hydraulic cylinders governing
the front wheel steering.
-
Install the flexible cables governing the hand and
pedal throttle, inserting the retaining clips.
-
Reconnect the throttle control tie-rod to the in‐
jection pump, inserting the retaining clip.
-
Working from inside the cab, fit the four plugs to
gain access to the upper bolts securing the en‐
gine, located at the base of the steering column.
-
Refit the pedal on the differential lock drive shaft,
the retaining pin and the footboard.
84176561
- 03-2008
SECTION 10 - ENGINE - CHAPTER 1
-
Refit the two right- and left-hand dashboard
panels and the relevant four fixing knobs.
-
Refit the two power steering cylinder oil delivery
and return hoses.
-
Install the electrical connections between the
cab and the engine.
-
Reconnect the diesel delivery and return pipes to
the diesel pump and install the relevant plastic
fasteners.
-
Working on the left-hand side of the engine, in‐
stall the lift pump draw pipe and tighten the re‐
taining bolts.
-
Install the delivery pipe of the services pump on
the right-hand side of the engine and tighten its
fitting.
-
Refit the rigid pipe for drawing oil from the trans‐
mission and the two metal clamps.
-
Refit the power steering/four-wheel drive drain
pipe on both the left- and right-hand sides of the
engine.
-
Refit the lift pump draw pipe and lock the retain‐
ing bolts.
-
Refit the propeller shaft with its central support
and the retaining bolts.
-
Refit the front axle drive shaft guard, tightening
the front, central and rear retaining bolts.
-
Refit the front ballast together with the support
and insert the retaining pin and the split pins.
-
Install the fitting of the cab heater radiator coolant
return pipe connected to the bottom of the cool‐
ant pump and refill the engine coolant.
-
Refit the guard on the right-hand side of the fan,
tightening the three retaining bolts.
-
Refill the transmission-gearbox housing with oil.
-
Install the bonnet. Reconnect the battery nega‐
tive lead.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Td5020Td5030Td5040Td5050

Table of Contents