Electrical Connections - Riello RLS 190/M MZ Installation, Use And Maintenance Instructions

Dual fuel light oil/gas burners
Table of Contents

Advertisement

(A)
Model
RLS 190/M MZ
Calibration of thermal relay
9.3 A

ELECTRICAL CONNECTIONS

Use flexible cables according to EN 60 335-1
Regulations:
• if in PVC sheath, use at least HO5 VV-F;
• if in rubber sheath, use at least H05 RR-F.
All the wires to connect to the burner terminal
strip 7) must enter through the supplied fair-
leads. The fairleads and hole press-outs can be
used in various ways; the following lists show
one possible solution:
1- Pg 13,5 Three-phase power supply
2- Pg 11
3- Pg 11
4- Pg 9
D2998
5- Pg 13,5 Gas valves
6- Pg 13,5 Gas pressure switch or gas valve
N.B.
The burner has been type- approved for inter-
mittent operation. This means it shoulds com-
pulsorily be stopped at least once every 24
hours to enable the control box to perform
checks of its own efficiency at start-up. Burner
halts are normally provided for automatically by
the boiler load control system. If this is not the
case, a time switch should be fitted in series to
IN to provide for burner shut-down at least once
every 24 hours.
These burners are also fitted for continuous
operation, if they are equipped with control box
Landis type LGK 16.333 A27 (interchangeable
with the burner control box Landis LFL 1.333).
Wiring must be performed by qualified
personnel
regulations in force in the country of
destination.
Riello S.p.a. declines all responsibility for
changes or wiring performed in any way
other than that illustrated in these diagrams.
WARNING
32
Single-phase power supply
Remote control device TL
Remote control device TR
leak detection control device
in
accordance
with
Do not invert the neutral with the
phase wire in the electricity sup-
ply line.
the

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

20079219

Table of Contents