Download Print this page

Daikin RXM09VVJU Service Manual page 9

Hide thumbs Also See for RXM09VVJU:

Advertisement

Si002154E
Step
4
Disconnect the
connectors [S20] and
[S80].
5
Disconnect the
connector [S40] and
detach the snap band.
6
Disconnect the
connectors [S90] and
[S97].
Removal Procedure
Procedure
[S20]
[S40]
Snap band
[S90] [S97]
 When reassembling, make
[S80]
sure to pass the four way
valve harness inside the
overload protector and high
pressure switch connector.
(R26013)
Overload protector and high
pressure switch connector
[S20]: electronic expansion
[S80]: four way valve
[S40]: overload protector and
(R26015)
[S90]: thermistors
[S97]: liquid pipe thermistor
(R26016)
Electrical Box
Points
Four way valve harness
(R26014)
valve coil
high pressure switch
7

Advertisement

loading

This manual is also suitable for:

Rxm12vvju