Goodman UPFLOW Installation Instructions Manual page 8

Table of Contents

Advertisement

Air Handler / Coil
Line Voltage (Measure L1 and L2 Voltage)
Secondary Voltage (Measure Transformer Output Voltage)
Blower Amps
Heat Strip 1 - Amps
Heat Strip 2 - Amps
BLOWER EXTERNAL STATIC PRESSURE
Return Air Static Pressure
Supply Air Static Pressure
Total External Static Pressure (Ignoring +/- from the reading above, add total here)
Return Air Temperature (Dry bulb / Wet bulb)
Cooling Supply Air Temperature (Dry bulb / Wet bulb)
Heating Supply Air Temperature
Temperature Rise
Delta T (Difference between Supply and Return Temperatures)
Air Handler / Coil - (Inverter Matched)
Check EEV and EEV wiring is secure (no adjustment required)
Additional Checks
Check wire routings for any rubbing
Check product for proper draining
Check screw tightness on blower wheel
Check factory wiring and wire connections
Check product for proper clearances as noted by installtion instructions
°F to °C formula: (°F - 32) divided by 1.8 = °C
ELECTRICAL
TEMPERATURES
INVERTER AH / COIL ONLY
°C to °F formula: (°C multiplied by 1.8) + 32 = °F
Model Number
Serial Number
L1 - L2
R - C
8
IN. W.C.
IN. W.C.
IN. W.C.
DB °F
WB °F
DB °F
WB °F
DB °F
DB °F
DB °F

Advertisement

Table of Contents
loading

This manual is also suitable for:

Downflow

Table of Contents