Download Print this page

Nienkamper CERN DIVIDER Installation Manual

Advertisement

Quick Links

CERN DIVIDER
INSTALLATION GUIDE
TOOLS REQUIRED:
4mm Hex Key
5mm Hex Key
Rubber Mallet
1/2" Crescent Wrench
Level
Lay vertical beams on the ground with slots facing up.
Slide the bottom frame onto the vertical beams.
Attach the two remaining vertical beams to the case and the
bottom frame. Slide cases down to engage the hooks in the
vertical beam. It is not a problem if they do not full engage
at while laying down. Once the shelving unit is stood up they
can be tapped with a mallet to engage the hooks.
Customer Support: 1.800.668.9318
Email: mail@nienkamper.com
Web: www.nienkamper.com
HARDWARE:
1/4"-20 x
9/16" Joiner
Leveler Glide
Lay case on its back so that the metal tabs in the gable align
with the slots in the vertical beam. At this point do not slide
the case down to engage the hooks. Repeat for second
case.
Slide the top frame onto the vertical beams. Fasten with a
5/16"-18 button head screw.
Page 1 of 2
SUGGESTED MINIMUM CREW:
APPROXIMATE INSTALL TIME:
5/16"-18 x 1"
Button Head
2
1 Hr

Advertisement

loading

Summary of Contents for Nienkamper CERN DIVIDER

  • Page 1 CERN DIVIDER SUGGESTED MINIMUM CREW: APPROXIMATE INSTALL TIME: 1 Hr INSTALLATION GUIDE TOOLS REQUIRED: HARDWARE: 4mm Hex Key 1/4”-20 x 5/16”-18 x 1” 5mm Hex Key 9/16” Joiner Button Head Rubber Mallet 1/2” Crescent Wrench Level Leveler Glide Lay vertical beams on the ground with slots facing up.
  • Page 2 Place a block at the corners of the case and tap with a mal- let unit the cases are snug and the clips fully engage. Customer Support: 1.800.668.9318 THIS IS A GENERAL ASSEMBLY GUIDE, NOT ALL CONDITIONS MAY APPLY TO YOUR Email: mail@nienkamper.com PARTICULAR INSTALLATION. Web: www.nienkamper.com Page 2 of 2...