Gamatronic POWER+ PREMIUM 60 Installation Manual page 20

Modular ups system up to 60 kw
Table of Contents

Advertisement

Verify ac input voltages
Verify the voltage between neutral and ground
Verify dc voltage at battery cabinet switch.
Verify that FAST FUSES (SEMICONDUCTOR
FUSES) are in place between the battery and
the UPS. For example, the Bussmann "FWH"
fuse.
Verify that neutral is always connected
Verify that mains ac power CBs are in the OFF
position, that the battery CB is OFF, and that all
external switches are OFF.
If you have installed a maintenance bypass
switch, verify that it is set to Normal (Off)
Connect the battery box or boxes to the UPS
now.
Comments on site preparation – electrical: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Apply ac power and measure dc voltage
Turn the battery switches On to conduct
Verify module configuration and redundancy
Check the controller definition of total Ah of the
batteries
Verify proper time zone
Enter IP address of UPS into the controller
Comments on initial startup: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Measure output voltage with all ac inputs Off
Measure output voltage after cold start
Measure ac input voltage under load
Check total system load
Check correct operation
Check IP communication with controller
Comments on testing, if any:
14
G
E
I
AMATRONIC
LECTRONIC
NDUSTRIES
3-3 Config.:
Phase-to-Phase:
3x400 Vac, -22 % / +15 %
Phase-to-Neutral:
230 Vac, -22 % / +15 %
0–2 Vac
+360 V and – 360 V
Check diagram for proper connection
I n i t i a l S t a r t u p
+405 Vdc and –405 Vdc
Match specifications
Match installed batteries
Should be accurate
Obtain from system admin
T e s t i n g
230 V or as specified
230 V or as specified
Phase-to-phase and phase-to-neutral
voltage no less than 2% below no-load
values
3-3 Config: Output current is within
system specifications
L1= ___A; L2= ___A; L3=___A
No alarms or fault indications
Reach controller from browser
L
.
TD
P+ PREMIUM 60, Installation Guide, rel. 1.4
3.3.3 Step 3
3.3.3 Step 4
3.3.3 Step 5
3.3.4.1
3.5 Steps 1, 2
3.5 Step 3
3.6, Step 3
3.6, Step 5
3.6, Step 6
3.6.1
3.7.1
3.7.1
3.7.2
3.7.2
3.7.3