Connecting To A Dc Power Source - Cisco Catalyst PON Series Hardware Installation Manual

Hide thumbs Also See for Catalyst PON Series:
Table of Contents

Advertisement

Installation
Figure 17: Connecting an AC Power Cable to CGP-OLT-16T
Step 2
Plug the other end of the power cable into a power source.
Step 3
Verify that the power supply is receiving power by checking whether the PWR1 or PWR2 LED is green.
Note
Step 4
The OLT will automatically boot. The RUN LED keeps blinking green after the boot is completed.

Connecting to a DC Power Source

To connect the DC power supply directly to one or two DC power sources, follow these steps:
Warning
Before performing any of the following procedures, ensure that power is removed from the DC circuit.
Statement 1003
Warning
Hazardous voltage or energy may be present on DC power terminals. Always replace cover when terminals
are not in service. Be sure that the uninsulated conductors are not accessible when cover is in place. Statement
1075
Before you begin
Prior to connecting the power supply to a power source, ensure that the chassis is properly grounded.
Procedure
Step 1
Plug the DC power cable into the DC power supply.
Step 2
Turn off the power at the circuit breakers for the portions of the DC grid power that you are connecting to,
and verify that all the LEDs on the DC grid power supplies are off.
If the LED does not turn on, check the power connections on the power supply and the power source.
Cisco Catalyst PON Series Switches Hardware Installation Guide
Connecting to a DC Power Source
29

Advertisement

Table of Contents
loading

Table of Contents