UfiSpace S9300-32D Hardware Installation Manual page 19

400ge spine switch
Table of Contents

Advertisement

4 Insert the Chassis to complete the installation.
4.1 Pull the middle rail fully extended into lock position, an audible click can be heard when the
middle rail is fully extended and locked into position.
4.2 Insert the chassis by lining up the inner rails into the slot of the middle rail.
4.3 Slide the chassis into the middle rail until it hits a stop.
4.4 Push the blue release tab on each rail to unlock the rails and slide the chassis all the way
into the rack.
4.5 Lock the chassis into place by using the captive screw on the front of the inner rail.
Figure 19.
S9300-32D Hardware Installation Guide | 16

Advertisement

Table of Contents
loading

Table of Contents