Summary of Contents for UfiSpace S9710-76D

  • Page 1 S9710-76D Core/Edge Router Hardware Installation Guide R1.0...
  • Page 2: Table Of Contents

    11 Initial System Setup ......................24 12 Cable Connections ......................25 Connecting the USB Extender Cable ..................25 Connecting the 1PPS Interface .................... 25 Connecting the 10MHz Interface ..................26 Connecting the Transceiver ....................26 S9710-76D Hardware Installation Guide | i...
  • Page 3 13 Cautions and Regulatory Compliance Statements .............. 28 Cautions and Regulatory Compliances ................28 S9710-76D Hardware Installation Guide | ii...
  • Page 4: Overview

    1 Overview The UfiSpace S9710-76D is a high-performance, versatile, open disaggregated core and edge router. It provides 400GE high speed Ethernet ports and supports IEEE 1588v2 and SyncE timing synchronization features. The S9710-76D can connect to the UfiSpace S9705-48D fabric to provide a distributed disaggregated chassis architecture to fulfill the high traffic loading in 5G application scenarios.
  • Page 5: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None S9710-76D Hardware Installation Guide | 2...
  • Page 6: Installation Environment Requirements

    Space Clearance: The S9710-76D width is 17.16 inches (43.6cm) and shipped with a rack mount rails suitable for 19 inch (48.3cm) wide racks. The depth of the S9710-76D chassis is 30 inches (76.2cm) without the field replaceable units (FRUs) and comes with adjustable check mounting rails suitable for rack depths of 22 inches (55.9cm) to 33 inches (83.8cm).
  • Page 7: Preparation Check List

    S9710-76D is 2RU (3.45”/8.8cm) in height, 17.16” (43.6cm) in width, and minimum reserve depth of 36 inches (94.4cm) Thermal requirement S9710-76D working temperature is 0 to 45°C (32°F to 113°F), airflow direction is front-to-back Installation tools required #2 Philips Screwdriver, 4-AWG wire stripper, and crimping tool...
  • Page 8: Package Contents

    2 pcs Rail (for 4 post) 3.5lbs (1.6kg)/1 pcs (22”~33” rack depth) Screw Kit 2 sets 2 x Screw M4.0*L5.5mm 0.004lbs (1.9g)/1 set (for Rack Mount Rail) USB 3.0 Cable 1 pcs 7.8” (20cm) 0.03lbs(16g)/pcs S9710-76D Hardware Installation Guide | 5...
  • Page 9: Component Physical Information

    AC power cord (AC version only) 0.7lbs (318g) 17.16” x 30” x 3.45” S9710-76D (W x D x H) (436 x 762 x 87.7mm) PSU (W x D x H) 2.68 x 16.93” x 1.57” (68 x 430 x 40mm) Dimension 3.15”...
  • Page 10: Identifying Your System

    4 Identifying Your System S9710-76D Overview Figure 4. PSU Overview Power supply unit (PSU) with 1+1 Redundancy. Hot swappable, field replaceable unit (FRU). AC Version: Figure 5. S9710-76D Hardware Installation Guide | 7...
  • Page 11: Fan Overview

    400GE/100GE Service ports (labelled in blue in figure below) on the front panel will all function normally when OP2 is not enabled. Once OP2 is enabled, the service ports 01, 17, 19 and 35 S9710-76D Hardware Installation Guide | 8...
  • Page 12 (highlighted in yellow in figure below) will be reserved for OP2 functionality. Therefore, when OP2 is enabled, there will only be 32 service ports available. Figure 8. S9710-76D Hardware Installation Guide | 9...
  • Page 13: Rack Mounting

    Make sure the locking screw of the inner rail is positioned at the front of the chassis. 2.2 After the attachment pins are secured to the inner rail, lock the inner rail to the chassis using two M4 screws (one on each chassis side). S9710-76D Hardware Installation Guide | 10...
  • Page 14 4.4 Push the blue release tab on each rail to unlock the rails and slide the chassis all the way into the rack. 4.5 Lock the chassis into place by using the screw on the front of the inner rail. S9710-76D Hardware Installation Guide | 11...
  • Page 15 Figure 12. S9710-76D Hardware Installation Guide | 12...
  • Page 16: Installing Fan Modules

    5. An audible click will be heard when the fan module is installed correctly. The fan module will not go in all the way if it is installed in the wrong direction. Figure 15. S9710-76D Hardware Installation Guide | 13...
  • Page 17: Installing Power Supply Units

    3. Align the new PSU with the power bay, ensuring the PSU’s power connector is in the correct position. 4. Carefully slide the new PSU into the power bay and gently push until it is flush with the case. S9710-76D Hardware Installation Guide | 14...
  • Page 18 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Figure 18. S9710-76D Hardware Installation Guide | 15...
  • Page 19: Grounding The Router

    3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 19. S9710-76D Hardware Installation Guide | 16...
  • Page 20 Figure 20. 6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to the designated grounding location on the router. Figure 21. S9710-76D Hardware Installation Guide | 17...
  • Page 21: Connecting Power

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9710-76D is designed to support 1 + 1 power redundancy. 2. Attach the DC power cables to the lugs.
  • Page 22 Locate the DC power screw-type terminal block located on the PSU. Remove the plastic cover that is protecting the terminal block by removing the single screw locking it in place. Secure the two-hole lugs (with the DC power cable attached) to the terminal block. S9710-76D Hardware Installation Guide | 19...
  • Page 23: Ac Version

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9710-76D is designed to support 1 + 1 power redundancy. 2. Attach the power cable.
  • Page 24 4. Verify that the power supply is operating. If connected correctly, when turned on, the LED on the PSU will light up with a solid Green color designating normal operation. S9710-76D Hardware Installation Guide | 21...
  • Page 25: Verifying System Operation

    Fan fail: one or more Fans need service No Power Solid Green PSU 0 is working well Blinking Amber PSU1 fail (PSU1 need service) No Power Solid Green PSU 1 is working well Blinking Amber PSU2 fail (PSU2 need service) S9710-76D Hardware Installation Guide | 22...
  • Page 26: Psu Fru Led

    Additional information about fan status can be obtained by the LEDs located on the fan itself. LED Condition Equipment Status No input power Green Fan FRU function normal Amber Fan FRU abnormal, service is required S9710-76D Hardware Installation Guide | 23...
  • Page 27: Initial System Setup

    Download the suitable driver for your operating system (OS) using the URL below: • https://www.silabs.com/products/development-tools/software/usb-to-uart-bridge- vcp-drivers • https://www.silabs.com/ and search for CP210X Figure 29. 2. Check for serial control availability. Disable any serial communication programs running on the computer such as synchronization programs to prevent interference. S9710-76D Hardware Installation Guide | 24...
  • Page 28: Cable Connections

    Connect the USB 3.0 A Type plug (male connector) into the USB port (female connector) located on the front panel of the router. Figure 30. Connecting the 1PPS Interface Connect an external 1PPS cable with an impedance of 50 ohms to the port labelled “ 1PPS”. S9710-76D Hardware Installation Guide | 25...
  • Page 29: Connecting The 10Mhz Interface

    Before installing the router, take into consideration rack space requirements for cable management and plan accordingly. • It is recommended to use hook-and-loop style straps to secure and organize the cables. • For easier management, label each fiber-optic cable and record its respective connection. S9710-76D Hardware Installation Guide | 26...
  • Page 30 3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and gently push until it is secured in place. An audible click can be heard when the transceiver is secured in the port. S9710-76D Hardware Installation Guide | 27...
  • Page 31 Avertissement: Ne pas utiliser d’instruments optiques pour voir la sortie du laser. L’utilisation de instruments optiques pour afficher la sortie laser augmente les risques oculaires. Utilisez uniquement UL/CSA, IEC/EN60825-1 /-2 reconnu modules enfichables. S9710-76D Hardware Installation Guide | 28...
  • Page 32 This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions. S9710-76D Hardware Installation Guide | 29...
  • Page 33 Only afforded by the use of a tool or lock and key, or other means of security, and controlled by the authority responsible for the location. Suitable for installation in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA 75. S9710-76D Hardware Installation Guide | 30...
  • Page 34 www.ufispace.com...