S9500-22XST
Disaggregated
Cell Site Gateway
Hardware Installation Guide
R1.0

Advertisement

Table of Contents
loading

Summary of Contents for UfiSpace S9500-22XST

  • Page 1 S9500-22XST Disaggregated Cell Site Gateway Hardware Installation Guide R1.0...
  • Page 2: Table Of Contents

    1. System Power Consumption ..................19 2. Attaching the Power Cable ..................19 3. Tighten the screw ....................... 19 10 Verifying System Operation ............20 10.1 Front Panel LED ..................20 10.2 PSU FRU LED ....................21 10.3 Fan FRU LED ....................21 S9500-22XST Hardware Installation Guide | i...
  • Page 3 12.3 Connecting a Cable to the BITS Interface ..........23 12.4 Connecting the GNSS Interface ..............23 12.5 Connecting the 1PPS Interface ..............24 12.6 Connecting the 10MHz Interface ...............24 12.7 Connecting the Transceiver................24 13 Cautions ..................25 S9500-22XST Hardware Installation Guide | ii...
  • Page 4: Overview

    1 Overview The UfiSpace S9500-22XST is a high-performance, versatile open networking white box router that is designed to address the changing needs of backhaul transport requirements as Telecoms make the transition from legacy technologies towards 5G. It enables telecoms and service providers to deploy disaggregated open network infrastructure to lower costs and rapidly scale existing services for edge computing, mobile backhaul, and broadband access applications.
  • Page 5: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for • details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None S9500-22XST Hardware Installation Guide | 2...
  • Page 6: Installation Environment Requirements

    To ensure the active/active feed power design functions properly, a field with dual power circuit is recommend and a reserve of at least 200 watts on each power circuit. Space Clearance: The S9500-22XST chassis width is 17.32 inches and shipped with a rack •...
  • Page 7: Preparation Check List

    Cooling: The S9500-22XST airflow direction is front-to-back. Make sure the equipment on • the same rack have the same airflow direction. RS T GN SS SY NC ST AT FA N RT N PW R -75 V BIT S TO D...
  • Page 8: Package Contents

    (406.8 x 43 x 21mm) Screw Kit 8 x Screws M4.0*L6.5mm 8 sets 0.01lbs (6.5g)/1 set (for Adjustable Mounting Rail) Cable USB 2.0 A Type Male to Female 7.87” (200mm) 1 pcs 0.021lbs (9.7g)/1 pcs 200 mm S9500-22XST Hardware Installation Guide | 5...
  • Page 9: Component Physical Information

    0.1lbs (6.5g) per set mounting rail 17.32” x 11.89” x 1.713” S9500-22XST (W x D x H) (440 x 302 x 43.5mm) Dimension PSU (W x D x H) 1.99” x 8.31” x 1.58” (50.5 x 211 x 40.2mm) Fan (W x D x H) 1.57”...
  • Page 10: Identifying Your System

    4 Identifying Your System S9500-22XST DC Version Overview D = 11.89” (302 mm) W= 17.32” (440 mm) H = 1.713” (43.5 mm, 1RU) Figure 5. S9500-22XST Hardware Installation Guide | 7...
  • Page 11: S9500-22Xst Ac Version Overview

    4 x SMA 1PPS In/Out Type-A USB 10MHz In/Out Console 3 x 4028 Fan Modules Figure 6. S9500-22XST AC Version Overview D = 11.89” (302 mm) W= 17.32” (440 mm) H = 1.713” (43.5 mm, 1RU) Figure 7. S9500-22XST Hardware Installation Guide | 8...
  • Page 12: Dc Version Psu Overview

    Figure 8. DC Version PSU Overview 1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU). Figure 9. Latch Color: Blue 198.5 AIR FLOW SPEC LABEL CUS BAR CODE 40.2 EMI Shielding Gaskets (3x) Handle Color: Black Figure 10. S9500-22XST Hardware Installation Guide | 9...
  • Page 13: Ac Version Psu Overview

    AC Version PSU Overview 1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU). Figure 11. Figure 12. Fan Overview 3+1, hot swappable fan field replaceable unit (FRU). Figure 13. S9500-22XST Hardware Installation Guide | 10...
  • Page 14: Port Overview

    0 ~ 3 RJ45 328.01ft (100m) 1GE/100M 4 ~ 11 SFP+/SFP 24.85mi (40km) 10GE/1GE/100M 12 ~ 19 SFP28/SFP+/SFP 24.85mi (40km) 25GE/10GE/1GE 100GE/40GE 20 ~ 21 QSFP28/QSFP+ 24.85mi (40km) Breakout 25GE/10GE DC Version: Figure 14. AC Version: Figure 15. S9500-22XST Hardware Installation Guide | 11...
  • Page 15: Rack Mounting

    RT N S95 00- PW R -75V 30X S BITS RT N 1PP S -75V S ANT 10W HZ Figure 17. SYN C STAT S95 00-3 -75V BITS 1PPS -75V S ANT 10W HZ Figure 18. S9500-22XST Hardware Installation Guide | 12...
  • Page 16: Installing Fan Modules

    4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the router case. 5. Secure the captive screw on the fan module to lock the fan in place. FA N FA N Figure 21. S9500-22XST Hardware Installation Guide | 13...
  • Page 17: Installing Power Supply Units

    1. Press and hold down the release tab located on the PSU inward to unlock the old PSU from the power bay. 2. While holding down the tab, grip the handle located on the PSU and gently pull the old PSU out of the power bay. DC Version: AC Version: Figure 23. S9500-22XST Hardware Installation Guide | 14...
  • Page 18 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. The router supports up to two PSUs that must have the same airflow direction as the installed fans. Note DC Version: AC Version: S9500-22XST Hardware Installation Guide | 15...
  • Page 19: Grounding The Router

    4. Using a crimping tool, firmly secure the grounding wire to the ground lug. Insula on Wire Lead Green/Yellow Ground Wire 0.5 +/- 0.02” (size #6 AWG) (12.7 +/- 0.5mm) Crimping Tool Grounding Lug Figure 24. S9500-22XST Hardware Installation Guide | 16...
  • Page 20 4 x M4 Lock Washers 2 x M4*L8.0 mm Screw Figure 26. Loca on-1 Loca on-2 Star Washers (4 pcs) Grounding Lug Install with Screw (2 pcs) & Ground Screw (2 pcs) Star Washers (4 pcs) Figure 27. S9500-22XST Hardware Installation Guide | 17...
  • Page 21: Connecting Power

    8.2 mm Screw Size: M3.5 Dangerous voltage!  Must be powered off before removing! d2 > 3.5 mm, W < 8.2 mm Waring!  Verify that all electrical connections are grounded before powering on Figure 29. S9500-22XST Hardware Installation Guide | 18...
  • Page 22: Ac Version

    Plug the power cord into the AC PSU and secure it tightly. 3. Verifying Power If connected correctly, when turned on, the LED on the PSU will light up with a Green color designating normal operation. Figure 30. S9500-22XST Hardware Installation Guide | 19...
  • Page 23: Verifying System Operation

    System timing core(1588 and SyncE) is synchronized to external timing source (ex: GNSS, 1PPS, PTP, BITS, etc). Solid Green NOTE: Need NOS to integrate this feature. System is synchronized in SyncE mode. Blinking Green NOTE: Need NOS to integrate this feature. S9500-22XST Hardware Installation Guide | 20...
  • Page 24: Psu Fru Led

    Equipment Status Main board 3.3V power fail or Fan is not present. Solid Green Fan is present and interrupt de-assert. Blinking Green N/A. Solid Amber N/A. Blinking Amber Fan is present but interrupt assert. S9500-22XST Hardware Installation Guide | 21...
  • Page 25: Initial System Setup

    • Stop bits: 1 • Flow control: None 4. Login the device After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. S9500-22XST Hardware Installation Guide | 22...
  • Page 26: Cable Connections

    BITS_T1_RTIP_CONN 1RX+ BITS_T1_RRING_CONN 1RX- 1TX+ 1TX- Figure 33. 12.4 Connecting the GNSS Interface Connect an external GNSS antenna with an impedance of 50 ohms to the port marked “GNSS ANT” located on the front panel of the router. S9500-22XST Hardware Installation Guide | 23...
  • Page 27: Connecting The 1Pps Interface

    3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S9500-22XST Hardware Installation Guide | 24...
  • Page 28: Cautions

    The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. S9500-22XST Hardware Installation Guide | 25...

Table of Contents