Installation - Ecoflo CM HP Installation And Operation Manual

Table of Contents

Advertisement

INSTALLATION

STEP 1: POSITION THE PEDESTAL
Locate the approximate area where you want the pedestal to go before cutting the hole.
The usual position for pedestals is centred between side walls.
NOTE: Due to the pedestals being man made, the distance to the centre may vary from 245 to 255mm.
Please check before cutting the hole.
STEP 2: POSITION THE WASTE CHUTE
A 240mm hole must be cut in the toilet room floor to accommodate the waste chute.
1
IMCM-204.031121
©Ecoflo Wastewater Management Pty Ltd
2
Page 5

Advertisement

Table of Contents
loading

Table of Contents